RFI - Attachment 8 - Energex Netwrok Connection Contract

of 11

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                3044 09.10.2018




Date: 12/01/2021


Curtis Consulting Group
Po Box 775
Cotton Tree Queensland 4558

Attention: Alex Curtis


Network Connection Contract
Energex Connection Services: Confirmed Cost

  Enquiry Reference No.          CX21LEO0705658A

  Work Request No.               As per WR7299446


Dear Alex,

We are pleased to provide you with this offer to provide Energex Connection
Services as requested in your application.

Please read this letter of offer (including all attachments) carefully.

Authority to contract

If you are not the Customer, you warrant that you are duly authorised by the
Customer to apply for connection and enter into a connection contract for the
Energex Connection Services on behalf of the Customer.

Offer Conditional

This offer will lapse 20 (twenty) business days from the above Issue Date. If
you wish to proceed after the offer has lapsed you must make a new
connection application. If you need to extend the time for acceptance or if
any of the details are incorrect, please email
[email protected] you choose to accept this offer, this document will form a connection                             Enquiries
                                                                                                     Darren Lamont
contract (‘the contract’) between you (or the Customer you are applying on
                                                                                                     Telephone
behalf of) and Energex for the design and construction of all works required                         0439 765 011
to establish a connection between your Premises and the Energex network.                             Email
In addition to this letter of offer, the contract will comprise the following parts:                 [email protected]

    (a)      Part 1 – Details specific to your connection and the Energex
                                                                                                     Corporate Office
             Connection Services;                                                                    26 Reddacliff Street
                                                                                                     Newstead QLD 4006
    (b)      Part 2 – any Special Conditions agreed between you and                                  GPO Box 1461
             Energex;                                                                                Brisbane QLD 4001
                                                                                                     Telephone (07) 3664 4000
    (c)      Part 3 – Energex general terms and conditions; and                                      Facsimile (07) 3025 8301
                                                                                                     www.energex.com.au
    (d)      Schedule 1 – Work Activities.                                                           Energex Limited
                                                                                                     ABN 40 078 849 055




                 Energex Limited ⚫ GPO Box 1461 Brisbane Queensland 4001 ⚫ ABN 40 078 849 055
Log in to download the original file

RFI - Attachment 8 - Energex Netwrok Connection Contract.pdf · 302 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 10 pages

Page 2

                                                                                   3044 09.10.2018
                                                                                       Page 2 of 11



How to Proceed

To finalise acceptance of this offer, please accept this letter of offer within 20 (twenty)
business days from the above Issue Date by either:

    •     accepting the letter of offer via the Energex Portal which can be found at
          https://www.energex.com.au/energexportals; or

    •     electronically signing and returning a signed copy in accordance with the
          process described below.

Electronic signing process

If you choose to accept this offer by signing electronically, please adhere fully to the
steps set out below. If you do not, the transaction may not be able to be finalised.

Step 1 –electronically sign the signing section of this letter of offer (do not alter any
        other part of the document) by either:
        • arranging for your authorised signatory to insert an electronic visual
          representation of their manual signature; or
        • (if the authorised signatory cannot sign electronically within the document)
          printing out the letter of offer and the schedules and arranging for your
          authorised signatory to sign in the signing section below.

Step 2 – If you sign electronically, please email the signed letter of offer and schedules
        in their entirety to [email protected]. We do not
        require the hard-copy of the signed letter of offer and schedules.

Please note the following:
        • Any alteration you make to the letter of offer or any of the schedules, not
          prominently highlighted in accompanying correspondence from you, will not be
          deemed to be accepted by Energex.
        • Digital signatures which do not also contain an electronic visual representation
          of the authorised signatory’s manual signature will not be accepted.




WR Reference: !Undefined Bookmark, WORKREQUE

Page 3

                                                                                                          3044 09.10.2018
                                                                                                              Page 3 of 11



Please do not hesitate to contact Darren Lamont on telephone 0439 765 011 if you
would like any further information about this matter. Please quote the work request
number at the start of this letter.

Yours sincerely




Darren Lamont
Customer Technical Assessment Officer
Energex Authorised Person

Privacy Notice: Our Privacy Policy sets out how we manage the collection, storage, use and disclosure of your
personal information for the purpose of our business activities in accordance with the Australian Privacy Principles
contained in the Privacy Act 1988 (Cth). It also provides information on how you may access and seek correction of your
personal information or lodge a complaint if you believe we have not adhered to the Australian Privacy Principles. For a
copy of our Privacy Policy, please contact us on 13 12 53 or visit energex.com.au.




WR Reference: !Undefined Bookmark, WORKREQUE

Page 4

                                                                            3044 09.10.2018
                                                                                Page 4 of 11



Acceptance by the Customer or Connection Applicant on behalf of the Customer

The Customer hereby accepts the Terms and Conditions outlined in this letter of offer
for the Energex Connection Services. Where signed by an agent on behalf of the
Customer, the agent warrants that the Customer is aware of the terms of the offer and
authorises the agent to accept this offer on its behalf.


For individuals

   Signature                                    Witness Signature

   Print Name                                   Print Name

   Date                                         Date



For companies

   Company name:

   Director Signature                           Director / Secretary
   OR                                           OR
   Authorised Representative                    Witness Signature

   Print Name                                   Print Name

   Date                                         Date




WR Reference: !Undefined Bookmark, WORKREQUE

Page 5

                                                                                                                 3044 09.10.2018
                                                                                                                     Page 5 of 11




Part 1 – Your Connection
  1.    Energex Address                              Energex Limited
        for Notices                                  GPO Box 1461
                                                     BRISBANE QLD 4001
                                                     Attention: Darren Lamont
  2.    Customer                                     Devcon Capital 9 Pty Ltd
                                                     ABN or ACN: 96641631156
  3.    Customer’s Address                           Devcon Capital 9 Pty Ltd
        for Notices                                  Po Box 1296
                                                     Buddina Queensland 4575
                                                     Attention: Simon Drew
  4.    Premises                                     11 LEO ALLEY Road, NOOSAVILLE QLD 4566
  5.    Description of Premises                      The Premises Connection Assets at the Premises shall consist of a
        Connection Assets and                        Service Line and the Consumer’s Mains.
        Connection Point                             The Connection Point shall be located on the first property pole
                                                     (termination pole) from the point of origin of the Service Line. Refer
                                                     QECMM Clause 5.4 for installation requirements.


  6.    Maximum Connection Capacity The maximum potential connection capacity will be 315 Amps three
                                    phase.
  7.    Energex Connection Services                  The establishment of a physical link between the Premises and the
                                                     Energex distribution system.
                                                     As part of the Energex Connection Services, Energex will undertake
                                                     the network alteration/extension works (if any) detailed in Schedule 1.
  8.    Connection Charges                                (a) The Connection Charges payable are $0.00 (including GST).
                                                          (b) If the Energex Connection Services involve the provision of
                                                              services for which Connection Charges cannot be
                                                              determined at the time of this offer, then the Connection
                                                              Charges will include the amount for the service as set out in
                                                              the Tariff Schedule. Energex will provide these charges to your
                                                              nominated Electricity Retailer who will include the associated
                                                              Connection Charges in your next electricity account.
  9.    Metering Equipment                           You will be responsible for arranging for appropriate Metering
                                                     Equipment to be installed at the Premises.
  10. Payment Schedule for                           Energex requires the Connection Charges set out in Item 8(a) to be
      Connection Charges                             paid within 5 business days of the date of acceptance of this contract.
                                                     If full payment of the Connection Charges set out in Item 8(a) is not
                                                     received within this time period, Energex may terminate this contract.
                                                     Any Connection Charges referred to in Item 8(b) should be paid in
                                                     accordance with the terms agreed with your Electricity Retailer.




                                 Energex Limited ⚫ GPO Box 1461 Brisbane Queensland 4001 ⚫ ABN 40 078 849 055

WR Reference: !Undefined Bookmark, WORKREQUE

Page 6

                                                                                                                   3044 09.10.2018
                                                                                                                       Page 6 of 11



  11. Energex Obtained Approvals                     Energex will obtain the following approvals (where applicable):
                                                     (i)   traffic control permits from the relevant road authority;
                                                     (ii)  any environmental/vegetation clearing permits for clearing of
                                                           vegetation contained on a public road; and
                                                     (iii) local government authority approvals for the installation of any
                                                           Energex works on land or roads controlled by that local
                                                           government authority.
  12. Program for Energex                            Commencement Date:
      Connection Services                            Within one business day after all of the following conditions have been
                                                     met or the formation of this contract (whichever is the later):
                                                     (i) payment of the Connection Charges is received by Energex;
                                                          and
                                                     (ii) you have complied with all applicable Customer obligations
                                                          under clauses 6 and 7 of Part 2.
                                                     Completion Date:
                                                     Estimated works Completion Date will be 2 weeks from the
                                                     Commencement Date.
                                                     Energisation Date:
                                                     If you require Energex to energise the Premises to allow the supply of
                                                     electricity in addition to the Energex Connection Services, Energex
                                                     shall complete this energisation within 5 business days (unless an
                                                     alternative timeframe has been agreed) of the last of the following to
                                                     occur:
                                                     (i) the completion of the Energex Connection Services;
                                                     (ii) Energex receiving a completed Electrical Works Request (EWR)
                                                           from your electrical contractor; and
                                                     (iii) Energex has received a completed service order from your
                                                           Electricity Retailer.
  13. Technical and Safety                           (i)    You, and any electrical contractor engaged by you, must comply
      Obligations                                           with the requirements set out in the Queensland Electricity
                                                            Connection and Metering Manual (‘the Manual’) relevant to the
                                                            Energex Connection Services. These requirements include,
                                                            but are not limited to, those set out in Chapters 5, 6 and 7 of the
                                                            Manual.
                                                            A copy of the Manual can be found in the Contractors and
                                                            Service Providers section of the Energex website:
                                                            www.energex.com.au
                                                      (ii) You must ensure that the Premises are wired by a qualified
                                                           electrician in accordance with Australian Standard AS3000 and
                                                           the requirements of the Electrical Safety Regulation 2002 (Qld)
                                                           (‘the Regulation’). Any work to be performed on or near
                                                           exposed electrical parts must be undertaken by ‘Authorised
                                                           Persons’ as defined under the Regulation and in accordance
                                                           with the requirements of the Regulation.




                                 Energex Limited ⚫ GPO Box 1461 Brisbane Queensland 4001 ⚫ ABN 40 078 849 055

WR Reference: !Undefined Bookmark, WORKREQUE

Page 7

                                                                                                                                         3044 09.10.2018
                                                                                                                                             Page 7 of 11




Part 2 – General Terms and Conditions
 1.     In this contract:                                                             materially and substantially from the physical conditions which
                                                                                      should reasonably have been anticipated by an experienced and
        Approvals means any consent, declaration, authorisation,
                                                                                      competent contractor at the date of the offer for Energex
        exemption, waiver or other approval required under any law,
                                                                                      Connection Services;
        statute, act, rule, order or regulation which is enacted, issued or
        promulgated by the State of Queensland, the Commonwealth of                   Maximum Connection Capacity means the maximum capacity
        Australia or any relevant local authority (including but not limited          of the connection point at the Premises as specified in Item 6 of
        to town planning approvals, building approvals, vegetation taking             Part 1;
        permits and soil disposal permits);
                                                                                      Metering Coordinator has the meaning given by the National
        Completion Date means the date determined in accordance with                  Electricity Rules.
        Item 12 of Part 1;
                                                                                      Metering Equipment means a device installed at the Premises
        Connection Charges means the connection charges identified in                 complying with Australian Standards that measures and records
        Item 8 of Part 1;                                                             the production and consumption of electrical energy;

        Connection Point means the point where your electrical                        Premises means the premises described in Item 4 of Part 1;
        installation is connected to the Energex distribution network;
                                                                                      Premises Connection Assets are those assets as described in
        Consumer Mains means the conductors between the                               Item 5 of Part 1;
        Connection Point and the main switchboard at the Premises;
                                                                                      Service Line means an electric line owned by Energex that
        Customer means the individual/s or business entity identified in              connects the Energex distribution network to the Connection
        Item 2 of Part 1 that have entered into a contract to purchase                Point;
        electricity with an Electricity Retailer;
                                                                                      Tariff Schedule means the Energex Tariff Schedule published
        Customer’s Activities means the work described in Schedule 1                  from time to time on its website setting out the charges and
        and further includes:                                                         services provided by Energex;
        (a)     all items necessary and incidental to the completion of               Work Activities means the Customer’s Activities and Energex
                such work including the obtaining of any Approvals for                Connection Services; and
                such work; and
                                                                                      You means the Customer identified in Item 2 of Part 1.
        (b)     the obtaining of all Approvals necessary for the
                completion of the Energex Connection Services other            2.     (Energex Connection Services) Energex must:
                than the Energex Obtained Approvals;                                  (a)     endeavour to obtain all Energex Obtained Approvals
                                                                                              necessary for the Energex Connection Services;
        Electricity Retailer means the entity with whom you have a
        contract to purchase electricity;                                             (b)     save for the Customer’s Activities, undertake the
                                                                                              design, construction and commissioning of the Energex
        Energex Connection Services means the work described in
                                                                                              Connection Services; and
        Item 7 of Part 1;
                                                                                      (c)     undertake the Energex Connection Services in
        Energex Obtained Approvals means the Approvals listed in                              accordance with the Manual referred to in Item 13 of
        Item 11 of Part 1;                                                                    Part 1.
        Force Majeure event means an event outside the reasonable              3.     (Nature of Energex Connection Services) You acknowledge
        control of you or Energex, including:                                         that:
        (a)     acts of God, explosion, rain, inclement weather, flood,               (a)     Energex may determine the design, specification and any
                    lightning, tempest, fire or accident;                                     other requirements for the Energex Connection
        (b)     war, hostilities (whether war is declared or not), invasion                   Services in its absolute discretion including but not
                or act of foreign enemies;                                                    limited to:
        (c)     rebellion, revolution, insurrection, military or usurped                      (i)     determining the point of origin, the route, the
                power or civil war;                                                                   length and facilities required for the Service Line;
        (d)     riot, civil commotion or disorder;                                                    and

        (e)     acts, restrictions, regulations, by-laws, refusals to grant                   (ii)    determining and approving the location of the
                any licences or permissions, prohibitions or measures of                              Connection Point.;
                any kind on the part of any governmental authority;                   (b)     the Energex Connection Services may from time to
        (f)     strikes, lock-outs or other industrial actions or trade                       time include works or other activities necessary to deal
                disputes of whatever nature; and                                              with an emergency; and

        (g)     any acts or omissions of subcontractors;                              (c)     the Maximum Connection Capacity will be as stated in
                                                                                              Item 6 of Part 1.
        Latent defect means physical conditions on the Premises or its
        surroundings, including artificial things but excluding weather
        conditions or the effect of weather conditions, which differ

                                    Energex Limited ⚫ GPO Box 1461 Brisbane Queensland 4001 ⚫ ABN 40 078 849 055

WR Reference: !Undefined Bookmark, WORKREQUE

Page 8

                                                                                                                                           3044 09.10.2018
                                                                                                                                               Page 8 of 11


4.     (Subcontracting) Energex may subcontract or assign its rights or              (e)     Energex being unable, despite reasonable endeavours,
       obligations under this contract as it determines in its absolute                      to secure all of the Energex Obtained Approvals.
       discretion.
                                                                             10.     (Technical and Safety Obligations) You must:
5.     (Customer’s Activities) If this contract identifies or there are              (a)     meet and comply with the Technical and Safety
       otherwise any Customer’s Activities that you must do to allow                         Obligations as described in Item 13 of Part 1 (if any);
       the carrying out of the Energex Connection Services, you must
                                                                                     (b)     If the Customer's Activities include the installation of
       carry them out at your own risk and expense.
                                                                                             Metering Equipment, you must ensure that such
6.     (Approvals) Except for Energex Obtained Approvals:                                    Metering Equipment meets all requirements of Item 13
       (a)    you must obtain all Approvals and other rights                                 of Part 1, and is sufficiently rated to be used at the
              necessary (including access requirements under clause                          Maximum Connection Capacity of your Premises; and
              7) for the carrying out of the Energex Connection                      (c)     accommodate on your Premises, and protect from harm,
              Services at your own risk and expense; and                                     all equipment installed on the Premises by Energex, its
       (b)    you must provide copies of all Approvals to be obtained                        sub-contractors or agents and all equipment necessary
              by you to Energex upon request by Energex.                                     for the connection.

7.     (Access) You must:                                                    11.     (Substation on your Premises) If Energex establishes a
                                                                                     substation at your Premises to facilitate the Energex
       (a)    allow Energex, its employees and subcontractors non
                                                                                     Connection Services, you consent to Energex providing
              exclusive access to land and improvements controlled by
                                                                                     connection services (including a supply of electricity) to other
              you to allow Energex to carry out the Energex
                                                                                     customers not at your Premises from that substation.
              Connection Services;
       (b)    where access to land controlled by a third party is            12.     (Payment of Energex's Costs) You must pay to Energex the
              required for Energex to complete the Energex                           Connection Charges prior to the commencement of the
              Connection Services, obtain approval from that third                   Energex Connection Services. Energex will provide a tax
              party for Energex to access that land in a form                        invoice for the Connection Charges on completion of the
              satisfactory to Energex in its absolute discretion; and                Energex Connection Services.

       (c)    if required by Energex, grant or procure the grant to          13.     (Termination) Energex may terminate this contract by notice to
              Energex of an easement or other interest over land on                  you at any time if:
              terms satisfactory to Energex to secure tenure for the                 (a)     you fail to pay the Connection Charges within 5
              Energex Connection Services.                                                   business days of the date of this contract;
8.     (Connection Services)                                                         (b)     you breach this contract;
8.1    (Commencement) Energex will not be in any way obliged to                      (c)     the information submitted by you in your application is
         carry out the Energex Connection Services until you have                            not accurate in a material respect;
         complied with the requirements of clauses 6, 7 and 10.                      (d)     the services requested by your electrical contractor in the
8.2    In relation to the program for the Energex Connection Services                        electrical work request are not of a kind contemplated by
         in Item 12 of Part 1:                                                               this contract;

       (a)    Energex undertake to complete the work required to                     (e)     on attending the Premises, Energex determines that any
              establish the connection by the Completion Date                                augmentation of its distribution system is required for the
              specified in that program, provided that you comply with                       Work Activities, other than works of a minor nature, in
              your obligations under clauses 5, 6, 7 and 10; and                             which case Energex will notify you of the applicable
                                                                                             connection service; or
       (b)    despite any provision of this contract, Energex will not be
              liable to you for any liability arising from delays to the             (f)     the Approvals, or any third party access requirements,
              progress or completion of the Energex Connection                               for the Energex Connection Services are not obtained
              Services for any reason to the full extent permitted by                        within a timeframe acceptable to Energex in its absolute
              law.                                                                           discretion.

9.     (Delay to Energex Connection Services) Notwithstanding                14.     (Amendment) This contract may be amended by agreement in
       clause 8.2 and the program in Item 12 of Part 1, Energex has no               writing between you and Energex.
       obligation to complete the Connection Services by the                 15.     (Insurance) While the Energex Connection Services are being
       Completion Date if Energex is delayed in completing the                       carried out, Energex must ensure that a public liability insurance
       Energex Connection Services due to:                                           policy is maintained which covers liability to third parties
       (a)    the occurrence of a force majeure event, for so long as                (including you) arising from death of or injury to any person or
              the force majeure event continues;                                     loss of or damage to any property prior to the Completion Date
       (b)    the discovery or existence of a latent defect, for the                 arising from Energex’s or Energex’s employees or agents
              period of time sufficient to rectify the latent defect; or             negligence in connection with the carrying out of the Energex
                                                                                     Connection Services for the amount of $20 million.
       (c)    the Customer’s Activities not being completed; or
       (d)    your Premises or the standard of the Customer’s                16.     (Energex's Liability)
              Activities not complying with the Technical and Safety                 (a)     The Competition and Consumer Act 2010 (Cth) and other
              Obligations as described in Item 13 of Part 1; or                              consumer protection laws provide certain statutory



                                     Energex Limited ⚫ GPO Box 1461 Brisbane Queensland 4001 ⚫ ABN 40 078 849 055

WR Reference: !Undefined Bookmark, WORKREQUE

Page 9

                                                                                                                                              3044 09.10.2018
                                                                                                                                                  Page 9 of 11


               guarantees, conditions, warranties or rights that cannot                        received a valid Tax Invoice (or a valid Adjustment Note)
               be excluded or limited.                                                         for that Taxable Supply.
       (b)     Subject to any such non-excludable rights under                  18.2   Reimbursements
               consumer protection laws, Energex gives no guarantee,
                                                                                       If a payment to a party under or in connection with this contract is
               condition, warranty or undertaking, and we make no
                                                                                       a reimbursement or indemnification, calculated by reference to a
               representation to you about the condition or suitability of
                                                                                       loss, cost or expense incurred by that party, then the payment
               electricity or the Energex Connection Services, the
                                                                                       must be reduced by the amount of any Input Tax Credit to which
               quality, fitness for purpose or safety of the electricity
                                                                                       that party is entitled for that loss, cost or expense. That party is
               supplied or of the Energex Connection Services, other
                                                                                       assumed to be entitled to a full Input Tax Credit unless it proves,
               than those set out in this contract.
                                                                                       before the date on which the payment must be made, that its
       (c)     Any liability Energex has to you under these laws that                  entitlement is otherwise.
               cannot be excluded but that can be lawfully limited is (at
                                                                                18.3   Adjustment Events
               Energex's option) limited to:
               (i)     providing equivalent goods and services to those                If, at any time, an Adjustment Event arises in respect of any
                       provided under this contract to your Premises; or               Taxable Supply made by a Supplier under this contract, a
                                                                                       corresponding adjustment must be made between the parties in
               (ii)    paying you the cost of replacing the goods or
                                                                                       respect of any amount paid pursuant to clause 18.1. Payments to
                       services provided under this contract to your
                                                                                       give effect to the adjustment must be made between the parties
                       Premises or acquiring equivalent goods and
                                                                                       and the Supplier must issue a valid Adjustment Note in relation to
                       services;
                                                                                       the Adjustment Event.
       (d)     Sections 97 and 97A of the Electricity Act 1994 (Qld) and
                                                                                18.4   GST Group
               119 and 120 of the National Electricity Law, and any
               other limitations of liability or immunities granted under              If a party is a member of a GST Group, references to GST which
               electricity legislation, are not limited in their operation or          the party must pay and to Input Tax Credits to which the party is
               application by anything contained in this contract.                     entitled, include GST which the representative member of the
       (e)     To the maximum extent permitted by law, and despite                     GST Group must pay and Input Tax Credits to which the
               any other provision in this contract, Energex is not liable             representative member of the group is entitled.
               to you (whether under contract, in tort, in equity, under        18.5   Non-monetary Consideration
               statute or otherwise) for any loss of profit, loss of
                                                                                       If a supply made under this contract is a Taxable Supply made for
               revenue, loss of use, loss of contract, loss of data, loss of
                                                                                       non-monetary consideration then:
               production, loss of opportunity, loss of goodwill, or any
               indirect, incidental, special or consequential damage, cost             (a)     the Supplier must provide the Recipient with a valid Tax
               or loss, howsoever caused.                                                      Invoice which states the GST inclusive market value of
                                                                                               the non-monetary consideration; and
         (f)   This clause 16 will survive the termination of this contract.
                                                                                       (b)     for the avoidance of doubt any non-monetary
17.    (Information) Energex will provide you with information that you                        consideration payable under or in connection with this
       reasonably request about your connection, if that information is in                     contract is GST inclusive.
       the possession or control of Energex as soon as reasonably
                                                                                18.6   Definitions
       practical following a request from you in writing.
                                                                                       Words or expressions used in this clause which are defined in the
18.    (GST)
                                                                                       A New Tax System (Goods and Services Tax) Act 1999 (Cth) and
18.1   (Goods and Services Tax)                                                        related imposition and amending Acts have the same meaning in
       Any Consideration to be paid or provided for any supply made                    this clause.
       under or in connection with this contract, unless expressly              18.7   Survival
       described in this contract as including GST, does not include an
                                                                                       This clause will continue to apply after expiration or termination of
       amount on account of GST.
                                                                                       this contract.
       Despite any other provision in this contract, if a party (Supplier)
                                                                                19.    Special Conditions) You and Energex agree any Special
       makes a Taxable Supply under or in connection with this contract
                                                                                       Conditions contained in Part 3 form part of the Agreement, and to
       on which GST is imposed:
                                                                                       the extent of any inconsistency with the terms of this Part 2, apply
       (a)     the GST exclusive Consideration otherwise payable or to                 in preference to the terms contained in this Part 2.
               be provided for that Taxable Supply under this contract
               but for the application of this clause is increased by, and      20.    (General) You and Energex agree:
               the recipient of the supply (Recipient) must also pay to                (a)     Energex will be relieved from complying with any
               the Supplier, an amount equal to the GST payable by the                         obligation under this contract to the extent it is prevented
               Supplier on that Taxable Supply; and                                            from performing the obligation by any matter or thing
       (b)     the amount by which the GST exclusive consideration is                          beyond Energex's reasonable control;
               increased must be paid to the Supplier by the Recipient
                                                                                       (b)     you must keep this contract and the terms of all dealings
               without set off, deduction or requirement for demand, at
                                                                                               with Energex in connection with this contract confidential;
               the same time as the GST exclusive consideration is
               payable or to be provided. However, the Recipient need                  (c)     notwithstanding clause 10(b), all materials, plant,
               not pay any amount referable to GST unless they have                            equipment or other items provided by Energex as part of


                                      Energex Limited ⚫ GPO Box 1461 Brisbane Queensland 4001 ⚫ ABN 40 078 849 055

WR Reference: !Undefined Bookmark, WORKREQUE

Page 10

                                                                                                                                              3044 09.10.2018
                                                                                                                                                 Page 10 of 11


                the Energex Connection Services remain Energex's                      (b)     all necessary resolutions have been duly passed and all
                property unless this contract states otherwise; and                           consents, approvals and other procedural matters have
                                                                                              been obtained or attended to as required by your trust
       (d)      this contract is to be governed and construed in
                                                                                              deed for you to enter into and perform this contract.
                accordance with the laws of Queensland.

21.    Privacy Notice                                                         23.     Partnership
       Our Privacy Policy sets out how we manage the collection,              23.1    Partnership
       storage, use and disclosure of your personal information for the
                                                                                      Where you are a partner in a partnership, unless the context
       purpose of our business activities in accordance with the
                                                                                      requires otherwise, a reference to a transaction, asset, act or
       Australian Privacy Principles contained in the Privacy Act 1988
                                                                                      liability of any nature of you includes the transactions, assets,
       (Cth). It also provides information on how you may access and
                                                                                      acts of liabilities of the partnership and of each partner of the
       seek correction of your personal information or lodge a complaint
                                                                                      partnership in their capacity as a partner. Where you incur an
       if you believe we have not adhered to the Australian Privacy
                                                                                      obligation, each partner also incurs that obligation in their
       Principles. For a copy of our Privacy Policy, please contact us on
                                                                                      capacity as a partner of the partnership.
       13 12 53 or visit energex.com.au.
                                                                              23.2    Partners’ representations and warranties
22.    Trusts                                                                         You and each partner represent and warrant that:
22.1   Trust                                                                          (a)     they are a partner of the partnership;
       Where you are a trustee, unless the context requires otherwise, a              (b)     they have the authority of the partnership to execute this
       reference to a transaction, asset, act or liability of any nature of                   contract (if applicable) on behalf of the partnership;
       you includes your transactions, assets, acts of liabilities as                 (c)     the execution of this contract (if applicable) is in the
       trustee. Where you incur an obligation, you incur that obligation                      ordinary course of business of the partnership;
       both in your own right and in your capacity as trustee, unless the
                                                                                      (d)     there is no restriction or limitation on or derogation from
       obligation relates only to an asset which you hold in your own
                                                                                              the rights of indemnity (whether or not arising under the
       right and not as trustee.
                                                                                              partnership agreement) of the partners and any person
22.2   Trustee representations and warranties                                                 authorised to bind the partnership; and
       You warrant and represent that:                                                (e)     any rights of recourse of the partners, or other persons
       (a)      you are empowered by your trust deed:                                         authorised to bind the partnership, against the assets of
                                                                                              the partnership are maintained.
                (i)     to enter into and perform this contract and to
                        carry on the transactions contemplated by this
                                                                              24.     Electronic signing
                        contract; and
                                                                                      Each party consents to the electronic signing of this contract by
                (ii)    to carry on your business as now conducted or
                                                                                      the other, by means of the insertion of an electronic visual
                        contemplated and to own your assets,
                                                                                      representation of the manual signature (either directly or by
                in your capacity as trustee of the trust and there is no              scanned image) of the relevant signatory, and agrees that no
                restriction on or condition of your doing so; and                     other method of electronic signing is permitted.

Part 3 – Special Conditions




                                      Energex Limited ⚫ GPO Box 1461 Brisbane Queensland 4001 ⚫ ABN 40 078 849 055

WR Reference: !Undefined Bookmark, WORKREQUE

Page 11

                                                                                                    3044 09.10.2018
                                                                                                       Page 11 of 11




Schedule 1 – Work Activities

ENERGEX WORK

1      Work at Premises
       i      Nil

2      Network Alteration / Extension Works
       i      Nil


CUSTOMER’S ACTIVITIES

3      The Customer must:
       i      Contact their Electricity Retailer and enter into a supply agreement with an electricity
              retailer for NMI 31206756356;
       ii     contact its Electricity Retailer (or a Metering Coordinator, as appropriate) to arrange
              for the appropriate Metering Equipment to be installed;
       iii    Engage an Electrical Contractor to facilitate the connection or upgrade to the premise.
              Such duties required are but not limited to;
              a.     ensuring the premise complies with the relevant standards and distributor’s
                     requirements (AS/NZL3000, Queensland Electricity Connection Manual,
                     Queensland Electricity Metering Manual);
              b.     submit and link an EWR to Connect Application CX21LEO0705658A ;
       iv     Engage an electrical contractor to organise and connect a generator to the main
              switchboard to avoid outages where practical;

The Customer must complete the above Customer Activities at least 1 week prior to the
estimated works completion date contained in Item 12 of Part 1. If the Customer fails to do
so, Energex may need to delay the completion of the work in accordance with clause 9 of
Part 2. The delays to rescheduling your Connection Services under the current Energex
Program will be up to a minimum of 2 weeks.




                     Energex Limited ⚫ GPO Box 1461 Brisbane Queensland 4001 ⚫ ABN 40 078 849 055

WR Reference: !Undefined Bookmark, WORKREQUE

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.