Original source · versioned page text
RFI - Attachment 8 - Energex Netwrok Connection Contract
3044 09.10.2018
Page 2 of 11
How to Proceed
To finalise acceptance of this offer, please accept this letter of offer within 20 (twenty)
business days from the above Issue Date by either:
• accepting the letter of offer via the Energex Portal which can be found at
https://www.energex.com.au/energexportals; or
• electronically signing and returning a signed copy in accordance with the
process described below.
Electronic signing process
If you choose to accept this offer by signing electronically, please adhere fully to the
steps set out below. If you do not, the transaction may not be able to be finalised.
Step 1 –electronically sign the signing section of this letter of offer (do not alter any
other part of the document) by either:
• arranging for your authorised signatory to insert an electronic visual
representation of their manual signature; or
• (if the authorised signatory cannot sign electronically within the document)
printing out the letter of offer and the schedules and arranging for your
authorised signatory to sign in the signing section below.
Step 2 – If you sign electronically, please email the signed letter of offer and schedules
in their entirety to [email protected]. We do not
require the hard-copy of the signed letter of offer and schedules.
Please note the following:
• Any alteration you make to the letter of offer or any of the schedules, not
prominently highlighted in accompanying correspondence from you, will not be
deemed to be accepted by Energex.
• Digital signatures which do not also contain an electronic visual representation
of the authorised signatory’s manual signature will not be accepted.
WR Reference: !Undefined Bookmark, WORKREQUE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.