                                                                                                         BROWN
                                                                                                               \".:111’   I   ’.,




                                Table 5: Options 3 Dodonaea Basin WSl Results


                                                         Dodonaea Basin
                   ARI          Previous Peak WSL          OPTION 3 Peak           Change in WSL (m)
                                     (m.AHD)               WSL(m.AHD)
          2                            10.81                    10.03                       -0.78
          5                            11.32                    10.42                        -0.9
          10                           11.59                    10.62                       -0.97
          20                           11.90                    10.89                       -1.01
          50                           12.04                    11.12                       -0.92
          100                          12.11                    1l.33                       -0.78




                            Table 6: Options 3 Dodonaea Basin Change in Volume   1m3)

                                                         Dodonaea Basin
                   ARI        Previous Peak Volume         OPTION 3 Peak           Change in Volume
                                       (m3)                 Volume (m3)                     (m3)
          2                             479                      99                         -380
          5                             950                      250                        -700
          10                           1304                      360                        -944
          20                           1808                      538                        -1,270
          50                           2073                      739                        -1,334
          100                          2202                      962                        -1,240




Significant changes are seen in the detention volume and the WSL between the previous model and
Option 3.       A reduction in the time for the basin to drain has also been determined.                 It takes

Dodonaea Basin 30 minutes less to empty during a 100 year ARI event then previously determined.

The times for Dodonaea Basin to empty are present in Table 7 below.


                               Table 7: Options 3 Dodonaea Basin Emptying Time


                                 Previous Emptying       OPTION 3 Emptying              Change in Time
                   ARI
                                     Time (min)               Time (mi.n)                   (min)
           2                            120                      100                         -20
           5                            165                      150                         -15
           10                           175                      155                         -20
           20                           185                      155                         -30
           50                           195                      165                         -30
           100                          175                      145                         -30
                 Times given for storm durations producing the peak WSL’s with the basin.


OPTION 4: This strategy analyses the developable areas of Stage C only. The upstream catchment

and drainage reserve (environmental corridor) are not considered in the model. Basins B1A, B1B

and Twigrush have been optimized to mitigate their upstream catchments only.


OPTION 4 applies a strategy where the analysis is only made in the development areas, and basins

are   sized to mitigate those areas.    Therefore, mitigation effectiveness is analysed by a per basin
basis.


An existing scenario has been modelled for the three developable catchments. Results of Peak Flows

are shown in Table 8 below.




B09182.w_Options_2_3_40NLY_130314.doex                                                                    Page 3

Used in these records

About this file

File size
39.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Further information re Request to Change Approval MCU 132003.221132.8.pdf · 39.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.