BROWN
\".:111’ I ’.,
Table 5: Options 3 Dodonaea Basin WSl Results
Dodonaea Basin
ARI Previous Peak WSL OPTION 3 Peak Change in WSL (m)
(m.AHD) WSL(m.AHD)
2 10.81 10.03 -0.78
5 11.32 10.42 -0.9
10 11.59 10.62 -0.97
20 11.90 10.89 -1.01
50 12.04 11.12 -0.92
100 12.11 1l.33 -0.78
Table 6: Options 3 Dodonaea Basin Change in Volume 1m3)
Dodonaea Basin
ARI Previous Peak Volume OPTION 3 Peak Change in Volume
(m3) Volume (m3) (m3)
2 479 99 -380
5 950 250 -700
10 1304 360 -944
20 1808 538 -1,270
50 2073 739 -1,334
100 2202 962 -1,240
Significant changes are seen in the detention volume and the WSL between the previous model and
Option 3. A reduction in the time for the basin to drain has also been determined. It takes
Dodonaea Basin 30 minutes less to empty during a 100 year ARI event then previously determined.
The times for Dodonaea Basin to empty are present in Table 7 below.
Table 7: Options 3 Dodonaea Basin Emptying Time
Previous Emptying OPTION 3 Emptying Change in Time
ARI
Time (min) Time (mi.n) (min)
2 120 100 -20
5 165 150 -15
10 175 155 -20
20 185 155 -30
50 195 165 -30
100 175 145 -30
Times given for storm durations producing the peak WSL’s with the basin.
OPTION 4: This strategy analyses the developable areas of Stage C only. The upstream catchment
and drainage reserve (environmental corridor) are not considered in the model. Basins B1A, B1B
and Twigrush have been optimized to mitigate their upstream catchments only.
OPTION 4 applies a strategy where the analysis is only made in the development areas, and basins
are sized to mitigate those areas. Therefore, mitigation effectiveness is analysed by a per basin
basis.
An existing scenario has been modelled for the three developable catchments. Results of Peak Flows
are shown in Table 8 below.
B09182.w_Options_2_3_40NLY_130314.doex Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further information re Request to Change Approval MCU 132003.221132.8Related documentApplication case desk ↗
About this file
- File size
- 39.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.