Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Further information re Request to Change Approval MCU 132003.221132.8

of 57

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (39.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 14, section 1. The text section number identifies this passage in the reader.

                                                                                                 BROWN
                                                                                                     ’w..:tt "




                                  Table 8: Options 4 Existing Peak Flows


                                                  Existing WBNM (Peak Flow mj/s)
ARI
                                   BlA                           BlC                  Twigrush
2                                  0.15                          0.20                   0.21
5                                  0.24                          0.32                   0.34
10                                 0.29                          0.38                   0.41
20                                 0.35                          0.47                   0.50
50                                 0.41                          0.53                   0.57
100                                0.48                          0.62                   0.65


For the developed scenario, identical basin configuration as previous options have been used for BIC

and BIA, and the original sized Twigrush Basin configuration from (OPTION 2) have been adopted.


With the objective being to mitigate developed peak flows to existing conditions with the smallest

basins   possible, factors were input into the model to optimize basin sizes to achieve the non-
worsening objectives. For BIA, BIC and Twigrush size factors of 40%, 55% and 65% were used
respectively. Table 9 shows the resultant peak flows and Table 10 shows the changes in Peak Flows.

                              Table 9: Options 4 Developed WBNM Peak Flows



                                                Developed WBNM (Peak Flow mj/s)
ARI
                                   BlA                           BlC                  Twigrush
2                                  0.08                          0.18                   0.20

5                                  0.20.                         0.24                   0.25

10                                 0.25                          0.30                   0.27

20                                 0.36                          0.42                   0.32

50                                 0.43                          0.53                   0.52

100                                0.49                          0.63                   0.66




                           Table 10: Options 4 Percentage Increase in Peak Flows


                                                 Increase (%)from Existing Scenario
ARI
                                   BlA                           BlC                  Twigrush
2                                 -51.3%                        -8.1%                  -5.3%

5                                 -19.3%                        -24.1%                 -27.4%

10                                -13.1%                        -21.4%                 -33.3%

20                                 2.8%                         -11.1%                 -37.1%

50                                 3.9%                         -1.5%                   -8.8%
100                                1.4%                          1.3%                   1.7%



It should be noted that the analysis for Option 4 does not take into account the timing of peak flows

from the upstream external catchment. Council may not accept this option as it is not a full

catchment analysis (which has previously been provided) and does not account for peak flows from

the site and upstream catchment coinciding.




B09182.W _Options_2_3_ 40N LV _130314.docx                                                       Page 4

Used in these records

About this file

File size
39.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Further information re Request to Change Approval MCU 132003.221132.8.pdf · 39.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.