Allow for fauna passage, including a fauna underpass;
Rehabilitate the fauna corridor area post construction in relation to the construction
disturbances and the changes to the soil hydrology and vegetation that will result
from the detention area;
Obtain an Op Works revegetation /rehabilitation approval for the above.
As a consequence of the above advices, further investigations into the designs of the various basins
associated with ’Option 3’ were undertaken, and in doing so, an alternate location for the proposed
Twigrush basin was proposed (refer attached sketch) affecting the alignment of the ’link road’. This
sketch was provided to Council on 27 March 2013 seeking confirmation that Council had no
fundamental concern with the proposal, wherein we were subsequently advised by Senior
Development Planner Denis Wallace (by email dated 3 April 2013):-
-
I confirm that we’ve no fundamental concern with the Twigrush basin proposal. Mark Lewis draws
your attention to the following:
. You need to ensure that the proposed T-intersection beside the basin is suitable for the
intended use (local traffic and bus route) and that the required geometry/sight lines are
achievable.
. It would desirable in any rearrangement of the lots that sufficient space is left for
pedestrian paths and for maintenance access to the basins. Maintenance for the
relocated basin should be from the lower order streets not the link road.
Based on the above, Brown Consulting (QLD)Pty Ltd have completed a review of the Stormwater
Management Plan solution for Stage C of Doonella Noosa, which achieves the fundamentally agreed
outcomes of both Council and Stockland Lake Doonella Pty Ltd (refer attached Updated Management
Strategy). Please note, the Updated Management Strategy has been prepared in addition to the
following previously provided documents:-
. Flood Investigation & Stormwater Management Plan (Report No. B09182.w-02A dated October
2011) prepared by Brown Consulting (QLD)Pty Ltd (provided with original request for a pre-
request response); and
. Letter from BMT WBM (formerly WBM Oceanics) summansmg revised Stormwater Quality
expectations dated 6 Jun 2012 (provided with original request for a pre-request response -
refer
attached); and
. Doonella Noosa Stormwater and Water Quality Management Plan Final Report Addendum
(Report No. R.B15573.002.99 dated July 2012) prepared by BMT WBM (provided via email dated
27 July 2012 refer attached).
-
On the anticipation that the revised design and modelling is acceptable to Council, we would like it to
replace the previous report that was prepared by WBM and is referred to in the approval. We
appreciate that this will require a change Condition 46 and Condition 49.
In response to the Updated Management Strategy, a number of changes to the layout were necessary
to accommodate the stormwater solution. These changes are relatively minor in nature and broadly
consist of the following:-
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further information re Request to Change Approval MCU 132003.221132.8Related documentApplication case desk ↗
About this file
- File size
- 39.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.