New Peak Flow Management Strategy (Option 3)
The Option 3 strategy to mitigated peak flow increase from the
development involves incorporating
changes to the configuration of the previously proposed Twigrush and Dodonaea Basins, with two new
Detention Basins designated as Basins B1A and B1C.
Changes to the Twigrush Basin and provision of two new basins allows for the reconfiguration of the
Dodonaea Basin outlet to incorporate a fauna crossing, with the objective to also reduce
peak flood
levels and times of inundation within this basin.
The configuration of all the detention basins within tIle
strategy to achieve the objectives is presented
in Table 1 below. Note that for Option 3 Sub Catchment 2B2 now bypasses the Basin. Refer
Twigrush
to Drawing No. B09182.W-SK01B in Attachment 2 for the updated Stormwater Management
Catchment Plan.
Table 1: Option 3 Basin Configurations
1,080 1,100 1,210
1.51 1.81 2.11
9.31 131 7.61 9
Basin Top RL (m.AHD) 10.8 14.8 9.7 12.25
Oudet Structure 1 x 225 dia Rep 1 x 225 dia Rep 1 x 375mm dia Rep 1 x 450mm dia Rep
1. A depth of 300mm is provided for treatment below the detention bottom.
The previous Watershed Bounded Network Model (WBNM) for the site has been updated to
incorporate the Option 3 strategy. Assumptions and methodology are consistent with previous
investigations and analysis for the site. Details of the updated developed sub-catchment areas and
calculated fraction impervious values are presented in Table 2 below. Refer to Drawing
No. B09182.W-SKOl IssueB for the location and delineation of each sub catchment area.
Table 2: Developed Scenario Sub-Catchment Details
Level 6, 199 Grey Street South Brisbane QLD 4101 Australia Brown Consulting (QLD)Pty Ltd
PO Box 10349 Adelaide Street Brisbane QLD 400U Australia ABN 38109428506
Telephone +61 7 3895 3444 Facsimile +61 7 3895 34UO brownconsulting.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further information re Request to Change Approval MCU 132003.221132.8Related documentApplication case desk ↗
About this file
- File size
- 39.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.