Further information re Request to Change Approval MCU 132003.221132.8
Very large file (39.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 43, section 1. The text section number identifies this passage in the reader.
CONCLUSION 3-1
3 CONCLUSION
The approved Doonella Noosa Storm water and Water Quality Management Plan (WBM, 2005)
identified that achievement of a no-net-increase was not always possible for nutrients as shown in
Tables 2-9 to 2-13 of this earlier report. These minor shortcomings were acceptable to Council and
its third party reviewers at the time and approved for development.
Currently only Stage C of the development remains to be approved. Due to loss of area for
stormwater treatment resulting from incorporation of the Link Road, the no-net-increase target is not
achievable, particularly for total nitrogen loadings.
The stormwater management system proposed for Stage C remains consistent with the intent of the
approved Doonella Noosa Stormwater and Water Quality Management Plan (WBM,2005), and there
are no further options to increase stormwater treatment within the proposed development layout for
Stage C.
Stage C when assessed against typical load based reduction targets for urban development in SEQ
is found to far exceed them.
3.1 Recommendation
Based on the fact that the proposed stormwater management system for Stage C is consistent with
the approved Doonella Noosa Storm water and Water Quality Management Plan (WBM,2005), and
that there are no further obvious options for incorporation of additional treatment elements, the
recommended stormwater system for Stage C remains appropriate.
It comes close to achieving a no-net-worsening, and easily achieves the typical load based reduction
targets for urban development.
It would be appropriate that the typical load based reduction targets for urban development were
adopted for the approval of Stage C, noting that the proposed system will operate at a much higher
level than this minimum requirement.
It is important to note also that all modelling completed to date, has not taken into any polishing effect
that may occur by the transfer of water through the very large bushland buffer (previously part of the
site and now owned by SCRC) which surrounds the site. It is expected that through the natural
processes, there will be further significant reductions in flows and pollutants before these enter into
any surrounding waters.
G.\ADMINIB15573.G.BADIR.B15573.002.00DOC "..
C BMTWBM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further information re Request to Change Approval MCU 132003.221132.8Related documentApplication case desk ↗
About this file
- File size
- 39.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.