Council archive · source document
Further information re Request to Change Approval MCU 132003.221132.8
Very large file (39.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 42, section 1. The text section number identifies this passage in the reader.
STORMWATER QUALITY MANAGEMENT DESIGN AND ASSESSMENTS 2-3
The predicted increase in TN load is around 30%. This is higher than what was originally
forecast in the approved Doonella Noosa Storm water and Water Quality Management Plan
(WBM,2005).
The loss of available area for treatment due to the Link Road has been an important factor in these
results.
When the result for Stage C is compared to the load based reduction target, it is seen that Stage C
far exceeds standard targets for development.
.t:~.
G.IADMINIB15573.G.BAD’R.B15573.002.00.00C
,’I"
’,~~ BMT WBM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further information re Request to Change Approval MCU 132003.221132.8Related documentApplication case desk ↗
About this file
- File size
- 39.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.