2009/695
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Chief Executive Officer, Sunshine Coast Regional Council, and shall
forthwith rectify the damage to that property or facility at its cost and to the satisfaction of the
Chief Executive Officer, Sunshine Coast Regional Council.
All rectification works are to be completed prior to the completion of works or, alternatively, the
Applicant may request the Council to carry out the rectification work at the Applicant’s cost,
such cost being paid by the Applicant to Council prior to the completion of works.
In the case of any emergency Council shall be entitled to rectify such damage at the cost of
the Applicant, such cost being paid prior to the completion of works.
12. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
13. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by Council’s CEO.
14. All signage, including that for safety during construction shall be in accordance with the
Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
15. Safe pedestrian access on Little Cove Road in the vicinity of the development shall be
maintained at all times. Should footpath / road closures be necessary to carry out construction
works, Council’s Construction Technical Officer (ph 0410 512 505) must be notified prior to the
proposed closure.
16. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved on drawing No<, it is the site's supervising engineer who is
responsible for ensuring that the sediment and erosion control measures have been designed
by an RPEQ or CPESC and constructed:
i. In accordance with "best practise" methods,
ii. Revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and methods,
iii. Revised to address predicted rainfall events, and
iv. Achieve the desired environmental outcomes.
v. Council’s CEO may request further controls to be installed should approved measures
be inefficient.
17. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply
5 REFERRAL AGENCY CONDITIONS
Not Applicable.
Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001ACB27.001.pdfRelated documentPublic source context ↗
Decision Notice - 010.2009.00000695.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.