Minor Change - MCU17 0568 01 & OPW17 0602 01 [As Published]

of 15

Page text shows just the words. Original shows the document exactly as it was published.

               66.    Where landscaping/garden beds are proposed adjacent to the bioretention basin, or where
                      the basin is located adjacent to naturally forested areas, a 900mm deep root barrier must be
                      installed to the interface between the landscape/garden/forest area and the bioretention
                      basin to prevent root intrusion to the bio basin infrastructure.
               67.    Landscaping to the surface of the bioretention basin filter media area must not commence
                      until 80% of building work within each contributing catchment is complete.
               68.    Where required, mulch within the batters of bioretention basins must be installed in a manner
                      that it will not escape into receiving stormwater drainage infrastructure or water courses.
                      Bioretention Devices - Education
               69.    The development shall be provided with approved permanent signage to educate the public
                      on the function of the bioretention basin. The wording for the signage for each bioretention
                      basin is to include: “BIORETENTION BASIN - This bioretention basin reduces the pollution
                      of our waterways by reducing the amount of heavy metals, litter, suspended solids, and
                      nutrients discharged to Cooroy Creek”.
                      Erosion & Sediment Control
               70.    A construction hold point with a council delegate and supervising RPEQ must be established
                      prior to commencement of cut to fill earthworks for each stage of the development. The hold
                      point must be held as soon as reasonably practical and prior to the first rain event forecast
                      following initial tree clearing or removal of soil stabilising material. At the hold point
                      inspection, all required sediment basins, drains and bunds to divert waters away from
                      disturbed soil or soils about to become exposed through cut to fill activities must be installed.
                      All areas that will not require earthworks in the imminent cut to fill operation must be stabilised
                      to prevent entrainment of sediments into receiving waters.
               71.    Cut to fill earthworks must not commence until after the Supervising RPEQ has certified that
                      all installed erosion and sediment controls required by this approval are sized in accordance
                      with conditions of the approval and the written acceptance of the certification is provided to
                      the supervising RPEQ by Council officers.
               72.    Offsite run-off must be diverted around exposed soils on the site without entraining additional
                      sediments. Discharge from measures to divert the offsite water must not cause run-off
                      impacts to other properties. Measures installed to divert the upstream water must be
                      designed and certified by the supervising RPEQ and installed prior to commencement of bulk
                      earthworks.
               73.    Any temporary drainage works to manage stormwater flows during the construction phase
                      of development must be designed by the supervising RPEQ to provide a 150mm freeboard
                      and convey the following flow capacities without resulting in visible scour within flow paths:
                      a)      1 in 2 year event where disturbed area open for less than 12 months
                      b)      1 in 5 year event where disturbed area open for 12-24 months
                      c)      1 in 10-year ARI event where disturbed area open for 24 months
                      d)      Minimum 1 in 1 year ARI Hydraulic capacity for temporary culvert crossings
               74.    E&SC measures must be installed and maintained to ensure any waters discharged from the
                      site up to and including a 85%ile 5 day rain event (or 46mm rainfall event) contain less than
                      50mg Total Suspended Solids per litre. All relevant measures detailed in the International
                      Erosion and Sediment Control Book 2008 must be installed to minimise the amount of
                      sediment leaving the site in rainfall events that exceed 85%ile 5 day or 46mm.
               75.    Peak 1-year ARI event discharge from the construction phase of development must be
                      equivalent to the pre-development peak 1-year ARI event discharge. Measures included in
                      calculations to achieve management of peak flows must be incorporated into the
                      development in a manner that is consistent with the Noosa Plan, all conditions of the approval
                      and does not interfere with adjoining properties.



                                                                                                         Page 10 of 15
Document Set ID: 22608628
Version: 4, Version Date: 05/10/2023
Log in to download the original file

Minor Change - MCU17 0568 01 & OPW17 0602 01 [As Published].pdf · 214 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.