Minor Change - MCU17 0568 01 & OPW17 0602 01 [As Published]
Building Height
5. The maximum height of the development must not exceed 10 metres above the finished
ground level and the natural ground level.
Performance Bond
6. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of Building Works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect of
enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Street Identification
7. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate, the
building name.
Signage
8. Any signage within the site must be in accordance with the Advertising Devices Code in The
Noosa Plan.
Water & Sewer Connections
9. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
10. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
must be submitted to Council that certifies an underground connection to reticulated water
and sewerage has been provided to the development site.
Engineering
11. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
12. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
footpath, the driveway and any associated fencing or vegetation near the driveway shall
comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4.
External Frontage Works
13. Street for the length of its frontage to the subject site must be upgraded in accordance with
an Operational Works approval and must include in particular:
a) Providing concrete pathway at minimum width of 1.8m along the frontage of the site
and be extended as may be necessary to achieve smooth connection and acceptable
transition with the existing pathway.
b) Removal of the existing redundant property accesses and reinstatement of the kerb &
channel and verge area to match the balance of the site frontage, including the
provision of topsoil and turf where the existing verge is grassed.
c) Replacement of any damaged, irregular or substandard sections of kerb & channel.
d) Amendment to any linemarking if required.
Stormwater Drainage
14. Stormwater runoff from the development must be disposed of on-site generally in accordance
with the approved engineering without causing scour or damage to the subject site or any
adjoining property.
15. Development must not adversely impact on the existing drainage conditions on other
properties.
Page 3 of 15
Document Set ID: 22608628
Version: 4, Version Date: 05/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original