Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 16, section 1. The text section number identifies this passage in the reader.
Good Shepherd Lutheran College Odyssey Consulting Group Proposed Unit Development Conceptual Stormwater Management Plan Lot 30 on SP170751 Project No: K4277 115 EUMUNDI NOOSA ROAD, NOOSAVILLE 5.3.4 Water Quality Monitoring and Inspections To ensure that the water quality objectives are being met during the construction phase of the development water quality monitoring shall be conducted at a monitoring station downstream of the works. Water quality monitoring shall use a calibrated probe and/or sampling and testing at a NATA registered laboratory. Location: Monitoring Station downstream of the proposed works. Parameters: Site discharge criteria. Frequency: Following at least 30 mm of rainfall in a 24 hour period. The contractor shall be responsible for the inspection and maintenance of all sediment and erosion control devices. Additional controls and review of existing controls shall be undertaken in response to the results of the above-mentioned monitoring program. 5.3.5 Reporting An inspection report shall be written by a suitably qualified and experienced scientist/engineer following each water quality monitoring episode. The report shall include at least the following information. Name, address and real property description for the development site; Council file reference number (if known); Monitoring locations; Performance criteria; Results for each monitoring location, identifying any breaches of performance criteria, and Recommended corrective actions to be taken and additional sediment and erosion controls, if required. Inspection reports shall be provided to the contractor for their action and compilation in an on-site register. If the above-mentioned performance criteria are exceeded and results from the downstream monitoring stations show significant deterioration from upstream results (if applicable), the contractor shall implement all recommendation of the inspection report within (1) working day of receipt of the report. 5.4 Operational Phase The following sections provide details of the stormwater quality improvement devices (SQID’s) proposed for the operational phase of the development. Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/A) and Odyssey Consulting Group, Stormwater Detention and Bioretention Details (Ref: K4277/P010/A) included as Appendix F illustrates the size and location of the proposed SQID’s. MUSIC Version 6.1.0 has been used for modelling of the proposed treatment train. 5.4.1 Stormwater Quality Improvement Devices Site runoff will be directed across permeable pavements into two bio-retention basins located at the South and West of the site. The proposed treatment train for the development is shown in Figure 4. K4277-0002 14 March 2018 Page 12 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.