Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
Good Shepherd Lutheran College Odyssey Consulting Group Proposed Unit Development Conceptual Stormwater Management Plan Lot 30 on SP170751 Project No: K4277 115 EUMUNDI NOOSA ROAD, NOOSAVILLE Table 13: Construction Phase Key Pollutants Pollutant Sources Litter Paper, construction packaging, food packaging, cement bags, material off cuts. Sediment Exposed soils and stockpiles during earthworks and building works. Fuel and oil spills, leaks from construction equipment and temporary car park Hydrocarbons areas. Cement slurry, asphalt primer, solvents, cleaning agents, and wash waters (e.g., Toxic Materials from tile works). Acids of Alkaline Acid sulphate soil, cement slurry and wash waters. Substances 5.3.2 Performance Criteria The following site discharge pollutant criteria have been adopted for water quality monitoring during the construction phase of the development. Table 14: Construction Phase Water Quality Performance Criteria Pollutant Criteria Total Suspended Solids 90th percentile <50mg/L pH 6.5 – 8.5 Dissolved Oxygen 90th percentile >80% saturation or 6mg/L Hydrocarbons No visible sheen on receiving waters Litter No visible litter washed from site. As recommended by Acid Sulphate Soil Management Plan (If Cations and Anions Applicable to Development). 5.3.3 Sediment and Erosion Controls Sediment and erosion control devices (S&EC) employed on the site shall be designed and constructed in accordance with the IECA, Best Practice Erosion and Sediment Control Guidelines (2008) as shown on Odyssey Consulting Group, Sediment and Erosion Control Plan and Details (Ref: K4277/P008/A & Ref: K4277/P009/A) included as Appendix G. Pre-Construction: Stabilised access/exit to the works area; Sediment fences to be located along the contour lines downstream of disturbed areas; Dust fencing to be installed as required; and Educate site personnel to the requirements of Erosion and Sediment Control Plan. Initial Construction – Bulk Earthworks: Maintain construction access/exit, sediment fencing, dust fences and all other existing controls as required. Second Stage Construction: Maintain construction access/exit, sediment fencing, dust fences and all other existing controls as required; Progressively revegetate finished areas where applicable; and Drainage structure protection around field inlets and gully pits. During construction, all areas of exposed soils allowing dust generation are to be suitably treated. Treatments will include mulching the soil and watering. Road accesses are to be regularly cleaned to prevent the transmission of soil on vehicle wheels and eliminate any build-up of typical road dirt and tyre dusts from delivery vehicles. Adequate waste disposal facilities are to be provided and maintained on the site to cater for all waste materials such as litter hydrocarbons, toxic materials, acids or alkaline substances. K4277-0002 14 March 2018 Page 11 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.