Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
Good Shepherd Lutheran College Odyssey Consulting Group Proposed Unit Development Conceptual Stormwater Management Plan Lot 30 on SP170751 Project No: K4277 115 EUMUNDI NOOSA ROAD, NOOSAVILLE The permeable pavement has been modelled with the following properties: Filter media Sandy Loam; 5 – 10% Organic Content in accordance with AS1289.4.1.1; Average D50 0.45 mm; Ksat 360 mm/hr; Filter media depth 0.40 m; Extended detention depth 0.1 m; Seepage 0 mm/hr; 2 2 Filter Area Pavement 1: 69m , Pavement 2: 150m ; 2 2 Surface Area Pavement 1: 69m , Pavement 2: 150m . 5.4.3 Post Development Modelling Results - Mitigated The stormwater quality improvement device (SQID) will reduce the amount of sediments and nutrients discharging from the proposed residential development. Table 15 illustrates the treatment train effectiveness of the proposed SQID’s. Table 15: Treatment Train Effectiveness of Proposed SQID Parameter Post Post Mitigated Reduction (%) Water Quality Objectives Flow (ML/yr) 6.24 6.19 0.8 - TSS (kg/yr) 1400 154 89 80% TP (kg/yr) 2.73 0.654 76 60% TN (kg/yr) 13 7.06 45.8 45% Gross Pollutants (kg/yr) 144 0 100 90% The results demonstrate that the proposed SQID meet the intended water quality objectives for flow, suspended solids, phosphorous and nitrogen levels. 6.0 OPERATIONAL PHASE MAINTENANCE REQUIREMENTS The proposed stormwater management devices will require maintenance and monitoring to ensure that they function as designed. The following section provides an outline of the necessary maintenance tasks for the proposed devices. 6.1 Bio-retention Basin Maintenance The most intensive period of maintenance is during the plant establishment period (first two years) when weed removal and replanting may be required. It is also the time when large loads of sediments could impact on plant growth particularly in developing catchments with poor building controls. Maintenance is primarily concerned with: Maintenance of flow to and through the bio-retention basin; Maintaining vegetation; Preventing undesired overgrowth vegetation from taking over the bio-retention basin; Removal of accumulated sediments; and Litter and debris removal. K4277-0002 14 March 2018 Page 14 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.