Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.

of 37

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

Good Shepherd Lutheran College                                                             Odyssey Consulting Group
Proposed Unit Development                                                   Conceptual Stormwater Management Plan
Lot 30 on SP170751                                                                                Project No: K4277
115 EUMUNDI NOOSA ROAD, NOOSAVILLE

        Vegetation maintenance will include:
            Fertilising plants;
            Removal of noxious plants or weeds; and
            Re-establishment of plants that die.

        Sediments accumulated at the inlets need to be monitored. Depending on the catchment activities
        the deposition of sediment can tend to smother plants and reduce the ponding volume available.
        Should excessive sediment build-up it will impact on the plant health and require removal before it
        reduces the infiltration rate of the filter media. The proposed SQIDs will require regular maintenance
        and monitoring to ensure that they function as designed.

        Table 16:         Bio-retention Basin Maintenance Schedule

          Bio-retention Basin Maintenance Checklist

          Inspection Frequency: 3 Monthly                                  Date of Visit:

          Location:

          Description:

          Site Visibility:

                                                                                                Action Required
          Inspection Items                                                Yes        No
                                                                                                    (Details)

          Sediment accumulation at inflow points?

          Litter basin?

          Erosion at inlet or other key structures (e.g. crossovers)?

          Traffic damage present?

          Evidence of dumping (Building waste, oils etc)?

          Vegetation condition satisfactory (density, weeds etc)?

          Replanting required?

          Mowing required?

          Clogging of drainage points (sediment or debris)?

          Evidence of ponding?

          Damage/vandalism to structures present?

          Surface clogging visible?

          Drainage system inspected?

          Resettling of system required?

          Comments:




6.2     Permeable Pavement Maintenance

        Sediment accumulated over the permeable pavement needs to be monitored. Should excessive
        sediment build-up it will reduce the permeability of the pavers, thereby inhibiting filtration through
        the pavers. The proposed SQIDs will require regular maintenance and monitoring to ensure that they
        function as designed.

K4277-0002                                              14 March 2018                                 Page 15 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.