Stormwater Management Plan
Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 20, section 1. The text section number identifies this passage in the reader.
Good Shepherd Lutheran College Odyssey Consulting Group Proposed Unit Development Conceptual Stormwater Management Plan Lot 30 on SP170751 Project No: K4277 115 EUMUNDI NOOSA ROAD, NOOSAVILLE Maintenance is primarily concerned with: Maintenance of flow to and across the permeable pavement; Preventing undesired overgrowth vegetation; Removal of accumulated sediments; and Litter and debris removal. 7.0 CONCLUSIONS Odyssey Consulting Group has been commissioned by Good Shepherd Lutheran College to prepare a Conceptual Stormwater Management Plan (CSWMP) for the Proposed Carpark at 115 Eumundi Noosa Road, Noosaville. This CSWMP details the conceptual planning, layout and design of the stormwater management infrastructure for both the construction and operational phases of this development. Hydraulic analysis demonstrated that the development will result in an increase in peak runoff as 3 compared with the pre development scenario. A detention tank with 126 m of volume is proposed to mitigate the development flows. A sediment and erosion control plan is provided for the construction phase of the development and shall be implemented by the contractor and developer. A combination of two bio retention basins, 20 2 2 2 m and 4m respectively and 219m of permeable pavement is proposed for the operational phase of the development to treat stormwater runoff. K4277-0002 14 March 2018 Page 16 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.