22854-s285 Concurrence agency response With conditions · OPW15/0121
Attached to the e-mail OPW15/0121 Concurrence Agency Response with conditions.
Our reference: SDA-0715-022854 Your reference: OPW15/0121 18 August 2015 Noosa Shire Council PO Box 141 TEWANTIN QLD 4565 Dear Mark Lewis Concurrence agency response—with conditions 25 Cooran Court NOOSA HEADS QLD 4567 (Lot 204 N21857) (Given under section 285 of the Sustainable Planning Act 2009) The referral agency material for the development application described below was received by the Department of State Development, Infrastructure and Planning under section 272 of the Sustainable Planning Act 2009 on 30 July 2015. Applicant details Applicant name: Pile-It Pty Ltd TA as Noosa Jetty Builders Applicant contact details: PO Box 672 NOOSAVILLE QLD 4566 [email protected] Site details Street address: 25 Cooran Court NOOSA HEADS QLD 4567 Lot on plan: 204 N21857 Local government area: Noosa Shire Council Application details Page1 SEQ North Region Level 8, Mike Ahern Building 12 First Avenue PO Box 1129 Maroochydore QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
SDA-0715-022854
Proposed development: Development Permit for Operational Works – Prescribed
Tidal Works (New Timber Jetty)
Aspects of development and type of approval being sought
Nature of Approval Brief Proposal of Level of
Development Type Description Assessment
Operational Work Development New timber jetty Code Assessment
permit
Referral triggers
The development application was referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger Schedule 7, Table 2, Item 15—Tidal works, or development in a
coastal management district
Conditions
Under section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in
Attachment 1 must be attached to any development approval.
Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department must set out the
reasons for the decision to impose conditions. These reasons are set out in Attachment 2.
Approved plans and specifications
The department requires that the following plans and specifications set out below and in
Attachment 3 must be attached to any development approval.
Drawing/Report Title Prepared by Date Reference Version/Issue
no.
Aspect of development: operational works
Jetty Plan and Details SCG Consulting July 2015 25251-J1
Engineers
A copy of this response has been sent to the applicant for their information.
Department of State Development, Infrastructure and Planning Page 2
Page 3
SDA-0715-022854
For further information, please contact Sarah Doring, Principal Planning Officer, SARA SEQ North
on 3882 8411, or email [email protected] who will be pleased to assist.
Yours sincerely
Garth Nolan
Manager Planning
cc: Pile-It Pty Ltd TA as Noosa Jetty Builders, [email protected]
enc: Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditions
Attachment 3—Approved Plans and Specifications
Department of State Development, Infrastructure and Planning Page 3
Page 4
SDA-0715-022854
Our reference: SDA-0715-022854
Your reference: OPW15/0121
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Operational works
7.2.15 Tidal works, or development in a coastal management district—Pursuant to section 255D of
the Sustainable Planning Act 2009, the chief executive administering the Act nominates the
Director-General of Department of Transport and Main Roads to be the assessing authority for the
development to which this development approval relates for the administration and enforcement of
any matter relating to the following condition(s):
1. Provide written notice to: When the
Regional Harbour Master development
Maritime Safety Queensland authorised under this
Macarthur Avenue East approval has started,
Pinkenba Qld 4008 and when it has
been completed.
when the development authorised under this approval has:
a) started; and
b) when it has been completed.
These notices must state this permit number, the location and
name of registered place and the condition number under which
the notice is being given.
2. "As Constructed" drawings must be provided to: Within two (2) weeks
Regional Harbour Master of the completion of
Maritime Safety Queensland the works.
Macarthur Avenue East
Pinkenba Qld 4008
3. The construction, operation or maintenance of the structure, and At all times.
any ship moored at this structure, must not impede the safe
navigation of other ships or restrict safe access to or from
neighbouring structures.
4. Any ship, dry berth or device (including Air Lifting Pontoons) At all times.
berthed, moored or attached to the structure must
not exceed the following sizes:
Wet berth — length overall: 5.0m;
Maximum vessel mass: 1500kg
5. The jetty must be constructed totally within the approved quayline. At all times.
6. No part of any structure or any ship berthed at the approved At all times.
structure is to encroach within 1.5 metres from the side
boundaries of the allocated water space as shown on the
submitted water allocation plan 25251-J1 as attached.
7. Any debris or similar obstruction encountered whilst undertaking Prior to the
the work must be suitably disposed of at the applicant’s cost. completion of the
works.
Department of State Development, Infrastructure and Planning Page 4
Page 5
SDA-0715-022854
No. Conditions Condition timing
8. The structure must be lit/marked in accordance with the following At all times.
specifications, such that it does not cause a risk to the safe
navigation of other ships:
Lighting must be provided in accordance with Maritime
Safety Queensland’s requirements and section 3 of AS
4282-1997 ‘Control of the obtrusive effects of outdoor
lighting’.
Department of State Development, Infrastructure and Planning Page 5
Page 6
SDA-0715-022854 Our reference: SDA-0715-022854 Your reference: OPW15/0121 Attachment 2—Reasons for decision to impose conditions The reasons for this decision are: To facilitate the monitoring of the development works for compliance purposes. To ensure the development does not encroach on the navigable waterway in a way that impedes the safe passage of vessels. To ensure the development does not adversely affect navigable access to neighbouring premises. To ensure that at all times, all lights on or above the development site do not interfere with safe navigation in surrounding waterways. Department of State Development, Infrastructure and Planning Page 6
Page 7
SDA-0715-022854 Our reference: SDA-0715-022854 Your reference: OPW15/0121 Attachment 3—Approved plans and specifications Department of State Development, Infrastructure and Planning Page 7
Page 8
Revision Description Date
. . .
. . .
. . .
Issue:
DEBUILD T/A
SCG
ABN 40 098 481 899
Title: Jetty Plan and Details.
Project Lot 204 Cooran Court
Noosa Waters
Rev.
Date: Jul 2015 Drg No. 25251 -J1 .
Used in these records
22854-s285 Concurrence agency response With conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 276 KB (small file)
- File type
No other editions are linked here.