Council archive · source document
22854-s285 Concurrence agency response With conditions · OPW15/0121
Attached to the e-mail OPW15/0121 Concurrence Agency Response with conditions.
SDA-0715-022854
Proposed development: Development Permit for Operational Works – Prescribed
Tidal Works (New Timber Jetty)
Aspects of development and type of approval being sought
Nature of Approval Brief Proposal of Level of
Development Type Description Assessment
Operational Work Development New timber jetty Code Assessment
permit
Referral triggers
The development application was referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger Schedule 7, Table 2, Item 15—Tidal works, or development in a
coastal management district
Conditions
Under section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in
Attachment 1 must be attached to any development approval.
Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department must set out the
reasons for the decision to impose conditions. These reasons are set out in Attachment 2.
Approved plans and specifications
The department requires that the following plans and specifications set out below and in
Attachment 3 must be attached to any development approval.
Drawing/Report Title Prepared by Date Reference Version/Issue
no.
Aspect of development: operational works
Jetty Plan and Details SCG Consulting July 2015 25251-J1
Engineers
A copy of this response has been sent to the applicant for their information.
Department of State Development, Infrastructure and Planning Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
22854-s285 Concurrence agency response With conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 276 KB (small file)
- File type
No other editions are linked here.