ORDINARY MEETING MINUTES                                                          17 MAY 2018


    19   All retaining walls must be designed and constructed in accordance with the planning
         scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
         retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
         with a commercial grade safety fence.
    Damage to Services and Assets
    20   Any damage caused to existing services and assets as a result of the development
         works must be repaired at no cost to the asset owner at the following times:
         a.   where the damage would cause a hazard to pedestrian or vehicle safety,
              immediately; or
         b.   where otherwise, upon completion of the works associated with the development.
         Any repair work which proposes to alter the alignment or level of existing services
         and assets must first be referred to the relevant service authority for approval.
    Stormwater Harvesting
    21   Operating stormwater harvesting tanks must be provided for the development. The
         tanks must be provided in accordance with a Building Works for above ground tanks,
         or Operational Works Approval for below ground tanks and must include the re-use of
         harvested rainwater for internal non-potable uses and outdoor uses.
    Acid Sulfate Soils
    22   An acid sulfate soils investigation (with recommendations) for the management of the
         proposed development must be undertaken by a qualified person* in accordance with
         the Queensland Acid Sulfate Soil Technical Manual Soil Management Guideline v4.0
         (2014), or a more current version and submitted with the application for Operational
         Works.
    23   All works must be carried out in accordance with the Acid Sulfate Soil and Groundwater
         Management Plan for the development prepared by a qualified person* and referenced
         in a Development Permit for Operational Works. *(Refer to Advisory Note)
    24   All waters, including stormwater runoff, groundwater seepage and leachate from acid
         sulfate soils must achieve the following quality prior to release from the site:
         a.   a pH range of 6.5-8.5 pH units
         b.   50mg/L maximum total suspended solids concentration
         c.   0.3mg/L maximum total iron concentration
         d.   0.2mg/L maximum total aluminium concentration
         e.   no visible plume at either the point of release from the site or within a waterway.
    Retention of Existing Trees
    25   All works must be carried out in accordance with section 4 of the Tree Safe Pty Ltd
         report listed within this Decision Notice.
    26   The Poinciana tree located within the road reserve must be retained.
    Landscaping Works
    27   The development site must be landscaped. The works must be undertaken in
         accordance with an Operational Works approval and the Noosa Plan for that specific
         area and must include in particular:
         a.   works shown on the approved Concept Landscape Plan, including the provision
              of a minimum of 3 x 100 litre trees between the building and Eumundi Noosa
              Road.


                                                                                  Page 22 of 30
Log in to download the original file

2018-05-17 Ordinary Meeting Minutes(PDF, 653KB).pdf · 669 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.