Table 3: Slope Instability Risk Assessment for Property
                                                          Consequence to
         Hazard                     Likelihood                                       Risk to Property
                                                             Property
 Scour and erosion of
                                   Almost certain           Insignificant                   Low
    creek banks
   Shallow rotational
                                     Possible               Insignificant                Very Low
 failure of creekbanks
   Translational slide
 following undercutting                Rare                     Mine                     Very Low
    toe of creekbank
Deep rotational failure                Rare                     Minor                    Very Low

Minor scour and erosion of the steep creek banks could be expected under high velocity flows.
Maintenance and repair is assumed to be undertaken following flood events to prevent the
progression of scour. It is also recommended that glamping huts be set back a minimum distance of
5 m or equal to the vertical height of the creekbank (whichever is greater) away from the crest of the
creekbank.

Based on the results of the slope stability assessment, the site is assessed to be ‘very low’ to ‘low’ risk
of slope instability provided that development of the site is carried out in accordance with good
engineering practice for hillside developments. The AGS Guidelines suggest that a low level of risk is
usually “acceptable”.

A factor of safety of 1.5 against global stability must be adopted in the design of all engineered design
retaining walls.


References:
AGS. (2007). Practice Note Guidelines for Landslide Risk Management. Australian Geomechnics,
Volume 42, No 1: Australian Geomechanics Society, Landslide Taskforce, Landslide Practice Note
Working Group.
AS 2159. (2009). Piling - Design and Installation. Standards Australia.
AS 2870. (2011). Residential Slabs and Footings. Standards Australia.
Fox, E. (2000). A Climate-Based Design Depth of Moisture Change Map of Queensland and The Use
of Such Maps to Classify Sites Under AS 2870-1996. Australian Geomechanics Volume 3, Number 4,
53 to 60.


Limitations: Douglas Partners Pty Ltd (DP) has prepared this report for the proposed glamping
retreat at 332 Eastern Branch Road, Kin Kin in accordance with DP’s proposal dated 17 October
2022. The work was carried out under DP’s Conditions of Engagement. This report is provided for
the exclusive use of Quentin Ellis for this project only and for the purposes as described in the report.
It should not be used by or relied upon for other projects or purposes on the same or other site or by a
third party. Any party so relying upon this report beyond its exclusive use and purpose as stated




Proposed Glamping Retreat                                                               211008.01.R.001.docx
332 Eastern Branch Road, Kin Kin                                                                   Dec 2022

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Geotechnical Report_compressed.pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.