Geotechnical Report_compressed · MCU22/0052

of 40

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                              Page 8 of 8




above, and without the express written consent of DP, does so entirely at its own risk and without
recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon
information provided by the client and/or their agents.

The results provided in the report are indicative of the sub-surface conditions on the site only at the
specific sampling and/or testing locations, and then only to the depths investigated and at the time the
work was carried out. Sub-surface conditions can change abruptly due to variable geological
processes and also as a result of human influences. Such changes may occur after DP’s field testing
has been completed.

DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the
advice provided by DP in this report may be affected by undetected variations in ground conditions
across the site between and beyond the sampling and/or testing locations. The advice may also be
limited by budget constraints imposed by others or by site accessibility.

The assessment of atypical safety hazards arising from this advice is restricted to the geotechnical
components set out in this report and based on known project conditions and stated design advice
and assumptions. While some recommendations for safe controls may be provided, detailed ‘safety in
design’ assessment is outside the current scope of this report and requires additional project data and
assessment.

This report must be read in conjunction with all of the attached and should be kept in its entirety
without separation of individual pages or sections. DP cannot be held responsible for interpretations
or conclusions made by others unless they are supported by an expressed statement, interpretation,
outcome or conclusion stated in this report.

This report, or sections from this report, should not be used as part of a specification for a project,
without review and agreement by DP. This is because this report has been written as advice and
opinion rather than instructions for construction.

Douglas Partners Pty Ltd




Brett Egen (RPEQ 8597)
Senior Associate

Attachments:          About this Report
                      Drawing 1 - Test Location Plan
                      Sampling Methods
                      Soil Descriptions
                      Rock Descriptions
                      Symbols & Abbreviations
                      Borehole Logs
                      Laboratory Test Results
                      AGS Guidelines
                      QBCC Notes




Proposed Glamping Retreat                                                            211008.01.R.001.docx
332 Eastern Branch Road, Kin Kin                                                                Dec 2022

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Geotechnical Report_compressed.pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.