               13.    A final Construction Management Plan must be submitted to Council prior to the pre-start
                      meeting. The plan must be generally in accordance with the Construction Management Plan
                      prepared by Barlow Shelley ref:1856-CMP-01 Version 2.0 dated October 2020 and include
                      the following amendments/additions:
                      a.      Section 2.3
                              i.       Working Hours
                              ii.      Written approval must be obtained from Council prior to any works outside of the
                                       approved operating hours
                              iii.     No works are permitted on Sundays
                      b.      Section 2.4
                              i.       Amend the commencement date
                      c.      Section 4.1
                              i.       include “No queuing of trucks is permitted on residential streets, especially prior
                                       to 7.00am. Further parked trucks must have engines turned off”
                              ii.      include details on the location of external fill/dump sites/sources, the haulage
                                       route, type of vehicle to be utilised during filling operations and frequency of
                                       usage.
                              iii.     include NB: any damage to the existing road system as a result of haulage
                                       operations shall be fully repaired at the applicant’s expense
                      d.      Section 4.12
                              i.       include establishment of a communication protocol with the general public,
                                       adjoining owners, emergency services and local businesses to advise of agreed
                                       construction times, impacts on traffic and services and other relevant issues
                              ii.      include a post out to the local residents and business advising of the proposed
                                       development, the expected time frames and the site contact details
                              iii.     include signage in prominent locations on the boundaries of the site advising of
                                       the proposed development, the expected time frames and the site contact details
                              iv.      include signage/displays in prominent locations within the adjacent shopping
                                       centre advising of the proposed development, the expected time frames and the
                                       site contact details
               14.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               15.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
                      Environment
               16.    Provide written evidence of Council’s receipt of monies required by Clause 4 of the
                      Environmental Offset Agreement.
               17.    Ensure all retained vegetation is clearly marked out on site for inspection by Council’s
                      delegate
               18.    Provide to Council for review a staged clearing plan, endorsed by the fauna consultant to
                      comply with fauna management requirements in this permit.
               19.    Provide to Council the written findings of the fauna consultant’s pre-clearing trapping works.




                                                                                                           Page 14 of 35
Document Set ID: 24395463
Version: 4, Version Date: 03/02/2026

Used in these records

About this file

File size
957 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice OPW20 145 06 (As Published).pdf · 957 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.