Decision Notice OPW20 145 06 (As Published) · OPW20/0145.06
DURING CONSTRUCTION
Engineering
20. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
21. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
22. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice
b. The relevant conditions of the higher order Reconfiguration of Lot approval viz.
Judgement No 765 of 2020 to which this approval relates
c. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines
d. The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site
Roadworks (External Roadworks & Road Widening Works)
23. All pavement widening or construction of new pavement must join neatly to the existing
pavement so that there are no irregularities in line or level resulting at or adjacent to the join
for the length of the construction. Where necessary the existing pavement must be brought
to a satisfactory standard to allow for the above.
24. All street surfacing must consist of a minimum depth of 45mm of an approved hot mixed
asphaltic concrete, unless other pavement types are approved as feature areas in
intersection thresholds, speed control devices, turning areas, indented parking etc.
25. The installation and/or modification of any traffic signs, street signs, line marking and Raised
Reflective Pavement Markings (RRPMs) must be in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD). New or relocated signage must be installed using the VLok
installation system. All new signage must be Class 1 retroreflective material in accordance
with AS 1906.1, Retroreflective materials and devices for road traffic control purposes – Part
1: Retroreflective sheeting.
26. The developer must notify Council’s Traffic Engineer for any works involving the removal or
modification of existing council traffic signs and/or parking bays prior to such works
commencing.
27. Root barriers are required to be installed behind the back of kerb for all new kerbs within 5m
of a trunk of a tree.
Pavement Design and Construction
28. The pavement designs shown on the engineering drawings are not approved. To attain
approval for the pavement design, the following details must be submitted and certified by
an RPEQ with the proposed pavement design:
a. The design CBR must be based on the four day soaked CBR value for the subgrade
material.
b. The design subgrade CBR must be representative of each homogenous insitu section
of finished subgrade. With respect to each section:
Page 15 of 35
Document Set ID: 24395463
Version: 4, Version Date: 03/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW20 145 06 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 957 KB (small file)
- File type
No other editions are linked here.