FURTHER REPORT - PEREGIAN ACTIVE STREET UPDATE · Report

of 7

Text shows just the words. Original shows the document exactly as it was published.

ORDINARY MEETING                                                                19 NOVEMBER 2026


13.2        FURTHER REPORT - PEREGIAN ACTIVE STREET UPDATE


Author            Project Officer, Lindsay Egeskov
                  Major Projects & Transport | Infrastructure Services Department
Index             ECM / TRANSPORT / PATHWAYS AND BICYCLE TRANSPORT
Attachments        1.   Attachment 1 - Coastal Pathway Stage 1 - Peregian Beach South
                        Design
                   2.   Attachment 2 - Coastal Pathway Stage 1 Diagrams


EXECUTIVE SUMMARY
A report on the Peregian Active Street was presented to the General Committee on 10 November
2026.

During consideration of the report, Council requested a further report with the following details:

E. Request the CEO undertake targeted engagement with residents directly adjoining the proposed
section of Coastal Path at Lorikeet Dr, Peregian Beach, including release of the existing designs and
report feedback verbally to the November 2026 Ordinary Meeting of Council for approval.

F. Request the CEO to provide a report to the November Ordinary meeting, including:
•   A summary of how the current draft report and recommendations have addressed the community
    feedback received to date;
•   Estimated impacts to parking;
•   More detailed diagrams to ensure councillors and public can visualise the outcomes.

This further report addresses Council's requests and provides additional context and clarification.
Due to the timing of the request for further engagement with residents directly adjoining the proposed
section, these responses will be presented verbally at the meeting.

RECOMMENDATION
That Council
A. Note the report by the Project Manager to the General Committee dated 10 November 2026 and
   the further report to the Ordinary Meeting dated 19 November 2026 regarding an update on the
   Peregian Beach Active Street Project;
B. Support the project 'Coastal Pathway Stage 1 - Peregian Beach South' in place of the 'Peregian
   Beach Active Street' project;
C. Proceed with delivering the 'Coastal Pathway Stage 1 - Peregian Beach South Design',
   (Attachment 1) utilising the approved SEQ Liveability funds noting the risks associated with the
   recommended scenario; and
D. Pending successful outcome of Active Transport Fund (ATF), proceed with further expansion of
   the proposed scope as indicated in the design, as provided at Attachment 1.


REPORT
Full text of the other 6 pages

Page 2

ORDINARY MEETING                                                               19 NOVEMBER 2026


Grant Funding Outcome Further Update
On 12 November 2026, informal advice was received from Active Transport Fund (ATF) that the
Minister has approved the scope variation and extension of time request as submitted by Noosa
Council, with a formal response pending. Council is required to provide a co-contribution as set out
in the report submitted to the General Committee meeting dated 10 November 2026, in order to
access the full funds available from ATF.

How the Recommendation Addresses Community Feedback


Key Themes                                          Response
Parking Impacts                                   The previous active street proposal indicated a
                                                  reduction of approximately 96 spaces. The
•   Loss and redistribution of on-street parking,
                                                  revised design results in a reduction of
    particularly on Lorikeet Drive
                                                  approximately 27 spaces. A less conservative
•   Flow-on effects for nearby residents,         interpretation of the guidelines has been
    including higher-density areas                investigated to retain parking opposite footpath
                                                  diversions which would further reduce the
•   Concerns from dog owners and volunteer        potential loss of car parking spaces to
    marine wildlife responders regarding access approximately 14 spaces subject to final detailed
    and proximity parking                         design.
•   Requests for resident permit parking or other
    measures to maintain accessibility

Traffic Access                                      Traffic calming, lower speed limit, and elements
                                                    associated with the active street, perceived to
•   Concerns about vehicles diverting to
                                                    cause rat running in neighbouring streets,
    neighbouring streets, including Oriole
                                                    removed from scope.
    Avenue
•   Desire for mitigation measures to reduce rat-
    running and maintain local access

Property Access and Displacement               Yellow line marking proposed to increase the
                                               available road width for reversing and u-turn
•   Difficulty accessing properties with boats
                                               manoeuvres at key locations. No reduction in
    and trailers (including 7m trailers)
                                               width proposed at Pitta Street or Lorikeet Drive
•   Concerns about reversing movements near cul-de-sac for turning movements.
    traffic calming devices and U-turn
    manoeuvres
•   Requests to widen driveways or adjust kerb
    clearances where required

Safety, speed and e-bikes                      Safety improved through inclusion of a 1.5 wide
                                               pathway and raised pedestrian crossing at Pitta
•   Broad support for slower traffic and a 30
                                               St. All other safety improvements proposed as
    km/h speed environment, particularly where
                                               part of the Active St proposal removed from
    paired with traffic calming
                                               scope as per the Council resolution on 18 June
•   Concerns about interactions between fast- 2026.
    moving e-bikes, pedestrians and vehicles
•   Vehicles driving in bike lanes and through
    roundabouts
•   Preference for clearly marked pedestrian
    crossings (e.g. zebra crossings) or higher-
    contrast shared zones

Page 3

ORDINARY MEETING                                                                  19 NOVEMBER 2026


•   Requests for education and enforcement to
    support compliance

Vegetation, Drainage and Neighbourhood          Pathway diversions in place to retain mature
Character                                       trees for community amenity and shade for
                                                pathway users. Elements of the active street
•   Strong preference to retain mature trees,
                                                including overrun areas, raised treatments, and
    including pandanus
                                                visually impactful infrastructure removed from
•   Desire to minimise visual and environmental scope.
    impacts
•   Concerns about stormwater runoff and
    drainage near driveways
•   Noise concerns associated with overrun
    areas (described as rumble strips) and
    raised treatments and increased cyclist use

Design Alternatives and Route Considerations     The proposed pathway alignment is based on
                                                 the Noosa High-Priority Route Corridor Study
•   Some residents suggested relocating cycling
                                                 Options analysis and Noosa Cycling and
    infrastructure to David Low Way or adjusting
                                                 Walking Strategy Planning documents. The
    pathway alignment (including the western
                                                 proposed route was considered to align closer to
    side).
                                                 the coast, connect with more attractors, be
•   Requests for wider pathways (suitable for    easier to implement and come at a lower cost. It
    two cyclists side-by-side)                   provides benefits for both local residents and
                                                 regional coastal pathway users. Further
•   Desire to extend pathway connections fully information is available on Council's project
    to the village                               webpage.
•   CPTED issues associated with the             A 1.5m wide pathway is the maximum width
    boardwalk and path diversion at Lorikeet     achievable without further impacts on existing
    Park                                         vegetation and carparking.
                                                       A continuation of the pathway through to the
                                                       village would be prioritised following
                                                       implementation of stage 1.
                                                       Route diversion through Lorikeet Park removed
                                                       from scope. Existing pathway alignment to be
                                                       retained with no change to CPTED issues.
Other Key Feedback                                     A continuation of the pathway through to the
                                                       village would be prioritised following
•   Support for stormwater upgrades and road
                                                       implementation of stage 1.
    repairs
                                                       Speed reduction removed from scope.
•   Requests for consistent pathway
    connections rather than partial sections
•   Mixed views on speed reductions, with
    stronger support where clearly linked to
    improved safety outcomes
•   A small number of submissions expressing
    full objection to the project in addition to the
    petitions.


Estimated Impacts to Parking

Page 4

ORDINARY MEETING                                                                19 NOVEMBER 2026


Along this section of road (Lorikeet Drive from Jabiru St to David Low Way), there are approximately
145 informal car parking spaces, assuming parking on both sides of the road, leaving a carriageway
width of 3.8m. The proposed active street project indicated a reduction of approximately 96 spaces.
The revised design includes five proposed footpath diversions, whereby parking is proposed to be
restricted on both sides resulting in a reduction of approximately 27 spaces. The project team have
investigated a less conservative interpretation of the standard to retain parking on one side which
would further reduce the potential loss of car parking spaces to approximately 14 spaces, however
it will reduce the carriageway width to 3.4m. This will be further refined as we move into the detailed
design process to balance: the provision of a safe and accessible pathway network, retention of
vegetation for both community amenity and shady / cool active transport links, and minimising the
loss of on-street parking.

The proposed pathway alignment includes diversions for the following reasons:
•   Reduce required tree clearing
•   Avoid costly service relocation
•   Achieve DDA compliant crossfall where possible
•   Reduce requirement for retaining walls/upstands and driveway reconstruction
•   Negate the need for earthworks and encroachment into private property
•   Provides the ancillary benefit of traffic calming

Detailed Diagrams
The following cross sections of the proposed pathway and diversion types and are to be read in
conjunction with the drawing set in Attachment 1.
Further graphics are provided in Attachment 2 for additional clarity.

Page 5

ORDINARY MEETING                                                               19 NOVEMBER 2026




Link to Corporate Plan
Theme No. 2 - Liveability
Liveability encompasses housing, facilities and services, transport, health and wellbeing to enable
an inclusive, connected and vibrant community.
Objective 2.2
Fund and deliver accessible and improved, parks, open spaces, walking and cycle paths and trails,
including greening our paths and cycleways to meet contemporary needs.
Objective 2.4
Advocate and partner with all levels of government for increased funding for connected transport
nodes, transit hubs, including walking, cycling and public transport and explore opportunities through
smart city, smart biosphere and innovation to transform the way we move around and engage in our
community.

Page 6

ORDINARY MEETING                                                                 19 NOVEMBER 2026



Theme No. 5 - Excellence
This theme focuses on customer experience, financial sustainability, innovation and technology,
levels of service, governance, our employees and volunteers, funding streams and asset
management practices.
Objective 5.6
Increase opportunities for meaningful collaborative community engagement which is highly
representative of our community, especially our youth.




Previous Council Consideration
Refer to General Committee Meeting dated 10 November 2026 Report Item 7.2.1


Finance
Refer to General Committee Meeting dated 10 November 2026 Report Item 7.2.1


Risk & Opportunities
Refer to General Committee Meeting dated 10 November 2026 Report Item 7.2.1


Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.


Consultation
External Consultation - Community & Stakeholder
Refer body of report and General Committee Meeting dated 10 November 2026 Report Item 7.2.1
Internal Consultation
Departments consulted:
    Office of the CEO, Mayor &         Community Services               Corporate Services
            Councillors
     Mayor & Councillors             Director                         Director
     Chief Executive Officer         Community Connection             Financial Services
     Executive Officers              Sport & Active Lifestyles        Revenue Services
     Community Engagement            Arts & Culture                   ICT
     Governance                      Customer Experience              Procurement

                                                                      People & Culture
     Strategy & Environment         Development & Regulation           Infrastructure Services
     Director                        Director                     x   Director
     Strategy & Sustainability       Development Assessment           Civil and Asset operations

Page 7

ORDINARY MEETING                                                      19 NOVEMBER 2026


    Economic Development       &                              Infrastructure Planning, Design
                                   Local Laws             x
    Destination Management                                    and Delivery
    Environmental Services         Environmental Health       Waste
    Innovation & Digital Hub       Building & Plumbing        Building & Facilities
    Commercial Property            Property / Permits         Disaster Management

                                                              Fleet

Used in these records

About this file

File size
732 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Report.pdf · 732 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.