RFI - Appendix B- Engineering Response Letter · MCU22/0140
ingeniir
Refer revised drawings indicating a new kerb inlet pit and lintel in line with current IPWEAQ
standards, it is noted that this varies from the current inlet configuration but would provide increased
capture capacity and be considered an improvement on the existing scenario.
7. Provide an amended Stormwater Management Plan demonstrating how the proposed
stormwater arrangement will not create a worsening of off-site conditions.
Additional field inlet pits have been added to the western boundary to assist in the redirection of
flows between the buildings. Currently the entire site (with the exception of the existing dwelling’s
roof water) drains to the West; the development proposes to redirect these flows to the road
reserves on both frontages of the site which will significantly improve and provide a benefit to the
neighbours on the western side.
The development to the East of the site has been approved and is currently under construction with
the same approach.
If you wish to discuss this matter further, please contact Daniel Kenna.
Yours sincerely,
Daniel Kenna
Beng CPEng MIEAust RPEQ 15522 NER 3133685 EC 66121
for and on behalf of Ingeniir Pty Ltd
Ingeniir Pty Ltd | 215101-RFI-01
ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
Page 2 | 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix B- Engineering Response Letter.pdfRelated documentApplication case desk ↗
About this file
- File size
- 145 KB (small file)
- File type
No other editions are linked here.