-17-

Water Supply $150,085
Sewerage $113,401
TOTAL $263,486

All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.

Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.

In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the contribution or trading bank guarantee will be returned.

Earthworks

108.

109.

410.

Alt earthworks carried out on site for construction activities shall be undertaken in accordance
with the “Geotechnical Investigation: Proposed Housing Development — 26 Attunga Heights,
Noosa Heads, Queensland” dated November 2003 and the further report dated 7 July 2004.

The applicant shall ensure the building designs and the type of foundation system(s) are
certified by a Geotechnical Engineer or similar qualified expert. This information shall be
submitted to the Council prior to obtaining a Development Permit for Operational Works.

In the sand dune area, unsupported temporary excavations are not to exceed 1.0 metres in
height and are to be formed no steeper that 30 degrees.

General

411.

112.

413,

Prior to undertaking any excavation, the applicant must ensure that any the person acting on
this permit shall contact public utility service providers to ascertain the location of their
underground services.

The applicant must ensure that any person acting on this permit applies for and obtains all other
necessary permits including crane permits, road opening permits, hoarding permits, footpath
occupation permits and/or any other approvals required under any other Act or local law.

Prior to commencement of work relating to a Development Permit for Operational Works, the
Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road
pavement, footpath, kerb and gutter, or other Council property damaged as a result of
construction of the proposed development.

The applicant must ensure that if any person acting under this permit damages any Council
property or facilities (such as underground drainage, water supply and sewerage), through any
cause whatsoever in the course of, directly or indirectly carrying out development, that person
notifies the Manager - Land Development of the Council and rectifies the damage at its cost and
to the satisfaction of the Manager - Land Development of the Council. Alternatively, the
Applicant may request the Council to carry out the rectification works, at the applicant's cost

Any damage to a water main shall be rectified by Council, at the applicant's cost. Any damage
to a sewer main shall be undertaken by either Council or a Council approved contractor, at the
applicant's cost.

In all cases, Council reserves the right to carry out rectification works in an emergency and
where no reasonable attempt has been made to complete the rectification works as part of the
development. :

All costs incurred by Council in any rectification works shall be repaid to Council prior to the
endorsement of the Plan of Survey.

Building

114.

The Geotechnical report submitted as part of the application has been appraised and approved
subject to the following conditions:-

114.1. There is to be no uncontrolled discharge of water onto the slope;

114.2.Stripping of vegetation for construction purposes should be minimised. If vegetation is
destroyed it should be reinstated immediately after construction is completed;

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23677 DA - Approved plans DECISION NOTICE - Planning Services Notice of Decision [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.