Council archive · source document
23677 DA - Approved plans DECISION NOTICE - Planning Services Notice of Decision [As Published] · 132003.221199
Plans and drawings: the text below has words only, no drawings.
-7- f) Rubbish storage areas constructed adjacent to Alma Way shall be suitably screened and there shall be an obligation to immediately return bins from their collection point after emptying. The collection area shall be maintained in a clean and tidy state. g) — There shall be no roof top terraces to any of the 30 dwellings. Revegetation / Landscape / Fauna Considerations 24, a) ‘The area adjacent to Lot 106 shail be densely landscaped in accordance with Council's Planning Scheme Policy PSP1 - Landscaping Guidelines in order to provide additional screening of Alma Way with such plantings to be initially of advanced stock including at a minimum 20 x 45 litre native trees adjacent the dwelling units and car parking areas. b) In conjunction with the developer / owner of Lot 106 on SP 151408 — the Viridian site, the applicant will on completion of its works remove the dividing fence between Lots 106 and 27 so as to allow free movement of fauna except in location where retention of the fence - is necessary for reasons of public safety. Management Plans 25. The Applicant shall prepare various management plans that relate to the design, construction and operational phases of the development. These plans are to be prepared by appropriately qualified persons and submitted to Council prior to issue of a Development Permit for Operational Works. The plans are to address specific matters detailed in the conditions of this approval. The plans to be submitted are: 25.1. Environmental Management Plan; 25.2. Ecological Restoration Plan and Specifications; 25.3. Vegetation Management Plan; 25.4. Weed Management Plan; 25.5. Fauna Management Plan; 25.6. Fire Management Plan; 25.7. Construction Management Plan (including Traffic Management Plan); 25.8. Stormwater and Water Quality Management Plan; and 25.9. Acid Sulphate Soils Management Plan. Fees Payable 26. 27. The Applicant shall pay Council all reasonable costs for the assessment of the management plans and also the costs associated with ensuring the development complies with the requirements of this approval. These costs shall be limited to a maximum of $30,000 including the cost of external consultants should they be required. The further approvals required to allow development to occur shall be subject to the fees contained in Council's Fees and Charges Schedule. Environmental Management Plan 28. 29. An Environmental Management Plan (EMP) shall be prepared and implemented to ensure that the impact of the development on the environment is minimised and that the environmental values of the site are protected and enhanced. The EMP is to: 28.1. Comply with AS14000. 28.2. Demonstrate a high level of environmental care and responsibility and be consistent with best practice for developments of this type in similar environments. 28.3. Detail the applicant's environmental policy and the proposed environmental management system for the site. The Environmental Management Plan shall specify to the reasonable satisfaction of Council: 29.1. the performance targets, including those derived from the conditions and other requirements arising from legislation and other approvals;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23677 DA - Approved plans DECISION NOTICE - Planning Services Notice of Decision [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.