Council archive · source document
23677 DA - Approved plans DECISION NOTICE - Planning Services Notice of Decision [As Published] · 132003.221199
Plans and drawings: the text below has words only, no drawings.
30. 31. 32. 33. -8- 29.2. how the performance targets are to be achieved, 29.3. when the performance targets will be satisfied; 29.4. how performance will be monitored: 29.5. corrective actions and contingency measures to be undertaken; 29.6. reporting arrangements (including monthly reports to Council during construction), 29.7. auditing arrangements; 29.8. how the requirements are to be incorporated into construction and works contracts; 29.9. how the developers employees, contractors and the contractor's employees will be informed and trained with respect to the environmental protection requirements; and 29.10.enforcement. The Environmental Management Plan shall apply to all works and activities on all areas of the site and adjacent road reserves. In particular, but without limitation, the Environmental Management Plan shall address the following issues in relation to the construction and operational phases of the development: 31.1. legislative compliance; 31.2. vegetation protection, 31.3. fauna and fauna habitat protection; 31.4. weed control; 31.5. pest control; 31.6. soil erosion and sediment control; 31.7. water quality protection; 31.8. groundwater protection; 31.9. air quality protection; 31.10.storage and handling of hazardous substances, 31.11.noise and vibration management, 31.12.waste management; 31.13. cultural heritage management, 31.14. visual amenity protection; 31.15. bushfire control; 31.16.environmental emergencies; and 31.17.community liaison. The Environmental Management Plan shall incorporate the requirement for monthly environmental compliance monitoring and audit reports to be submitted to Council for the construction stages of the development. The format and content of these reports shall be in hard copy and digital form, generally in accordance with the following: 32.1. Include tables of the monitoring results (digital form should be in Excel). 32.2. Include individual charts plotting the results for alf parameters required in the monitoring. 32.3. Include a brief written discussion of the results and recommend any necessary actions. The Applicant and ail future owners of the site shall comply with the relevant components of the Environmental Management Plan. This requirement will be included in the Community Management Statement for the units and the Lodge. Ecological Restoration Plan and Specifications 34, Prior to preparation of an Ecological Restoration Plan a quantitative survey shall be undertaken to identify the vegetative dynamics of the site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23677 DA - Approved plans DECISION NOTICE - Planning Services Notice of Decision [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.