Skip to the record
The only place to find full transcripts.

Council archive · source document

23677 DA - Approved plans DECISION NOTICE - Planning Services Notice of Decision [As Published] · 132003.221199

of 59

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
30.

31.

32.

33.

-8-

29.2. how the performance targets are to be achieved,

29.3. when the performance targets will be satisfied;

29.4. how performance will be monitored:

29.5. corrective actions and contingency measures to be undertaken;

29.6. reporting arrangements (including monthly reports to Council during construction),
29.7. auditing arrangements;

29.8. how the requirements are to be incorporated into construction and works contracts;

29.9. how the developers employees, contractors and the contractor's employees will be
informed and trained with respect to the environmental protection requirements; and

29.10.enforcement.

The Environmental Management Plan shall apply to all works and activities on all areas of the
site and adjacent road reserves.

In particular, but without limitation, the Environmental Management Plan shall address the
following issues in relation to the construction and operational phases of the development:

31.1. legislative compliance;

31.2. vegetation protection,

31.3. fauna and fauna habitat protection;
31.4. weed control;

31.5. pest control;

31.6. soil erosion and sediment control;
31.7. water quality protection;

31.8. groundwater protection;

31.9. air quality protection;
31.10.storage and handling of hazardous substances,
31.11.noise and vibration management,
31.12.waste management;

31.13. cultural heritage management,
31.14. visual amenity protection;

31.15. bushfire control;
31.16.environmental emergencies; and
31.17.community liaison.

The Environmental Management Plan shall incorporate the requirement for monthly
environmental compliance monitoring and audit reports to be submitted to Council for the
construction stages of the development. The format and content of these reports shall be in
hard copy and digital form, generally in accordance with the following:

32.1. Include tables of the monitoring results (digital form should be in Excel).
32.2. Include individual charts plotting the results for alf parameters required in the monitoring.
32.3. Include a brief written discussion of the results and recommend any necessary actions.

The Applicant and ail future owners of the site shall comply with the relevant components of the
Environmental Management Plan. This requirement will be included in the Community
Management Statement for the units and the Lodge.

Ecological Restoration Plan and Specifications

34,

Prior to preparation of an Ecological Restoration Plan a quantitative survey shall be undertaken
to identify the vegetative dynamics of the site.

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23677 DA - Approved plans DECISION NOTICE - Planning Services Notice of Decision [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.