GENERAL COMMITTEE MEETING AGENDA 13 JUNE 2022
d. the use of gravity stormwater drainage and not surcharge pits to the maximum extent
practicable. Surcharge pits may only be used where the catchment is composed of roof
surfaces only;
e. provision of rainwater tanks for the capture and reuse of roofwater for the irrigation of
communal landscaping; and
f. accommodation for both severe storms or severe blockage of the underground
drainage network. A Severe Storm/Severe Blockage Assessment for the drainage
system proposed for the site is to be provided with the development application for
operational works, and is to demonstrate that finished floor levels will not be inundated
under either a severe blockage of the underground drainage network in the 1%AEP
event at year 2100, or for a severe storm exceeding the 1%AEP based on design
blockage.
Stormwater Quality Management
43. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the latest version
of the Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland, and must include in particular:
a. stormwater quality treatment devices of a size and location generally in accordance
with those shown in Site Based Stormwater Management Plan, prepared by ADG,
dated 28th October 2021;
b. bioretention devices which:
i. are designed generally in accordance with the Bioretention Technical Design
Guidelines (Water by Design, 2012)
ii. are designed generally in accordance with IPWEQA Standard Drawing No. DS-
073, DS-075, DS-076, and DS-078
iii. are provided with a free-draining outlet from the sub-soil drainage system
44. Permanent educational signage must be erected to educate the residents of the development
about the function of the bioretention device(s). The dimensions, standard, presentation and
location of the educational signage must be in accordance with an Operational Works
approval.
45. All stormwater quality treatment devices must be maintained in accordance with the Water
by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved
Operational Works drawings for the stormwater quality treatment system and detailed life
cycle costing of the system must be attached as an addendum to this document. Records of
all maintenance activities undertaken must be kept and made available to Council upon
request.
46. Any proposed Community Management Statement required for the development must
include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1) and
must include the full cost of maintaining the system in accordance with Water by Design
(2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of maintaining the
system must be included in the proposed levies for each unit owner.
Landscaping Works
47. The development site must be landscaped. The works must be undertaken in accordance
with an Operational Works approval and the Noosa Plan for that specific area and Planning
Scheme Policy (PSP2) - Landscaping and must include in particular:
a. the works shown on the Approved Plans with the exception of the following:
i. Substitute Archontophoenix cunninghamiana (Bangalow Palm) for an
appropriate species selected from the Noosa Plan 2020 PSP20 Landscaping
Page 13 of 69
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.