GENERAL COMMITTEE MEETING AGENDA 13 JUNE 2022
Risks & Opportunities
Program Risks Mitigation
The TCP process was confirmed to provide the optimum scenario to enable
Insufficient
works completion within the available timeframe.
construction time to
complete dredging
This was tested against various construction programs using different working
works within Permit
arrangements, machine combinations and confirmed by market research with
timeframes.
capable contractors.
Financial Risks Mitigation
Indicative construction costs of similar works have been used to set the
budgetary allowance. The indicative cost was reaffirmed during the market
Dredging operation research of the current market and is within the budget allocation.
exceeding budgetary
allowance. The TCP offers the opportunity to source multiple quotes from suppliers, to
provide a value for money option.
Resource Risks Mitigation
A quote process under the TCP will enable a streamlined procurement process,
increasing the available construction timeframe. A smaller timeframe requires
larger dredgers and resultingly limits resource availability or capable contractors.
Quality, safety, and Market research has been conducted with suppliers to confirm contractor
service are affected capability and availability prior to invite.
due to resource
shortages.
Contractors will be requested to nominate a highly capable team for the project
and identify additional and appropriately skilled resources if required.
Legislative
Mitigation
Compliance Risks
The TCP enables Council to invite selected contractors who are considered
Compliance Issues
competent and capable with a proven track record for compliance.
Safety Risks Mitigation
The TCP enables Council to invite selected contractors who are considered
Contractor fails to competent and capable with a proven track record for compliance.
ensure the work is
conducted safely and
in accordance with
minimum standards. Council will undertake surveillance, regular safety audits and inspections
throughout the dredging services period.
Environment Risks Mitigation
Council engaged specialist completed BMT to develop a Dredge Management
Plan (DMP) that reviews the surrounding environment and to minimise potential
impacts of the dredging. The prepared DMP is approved for use by Department
of Environmental Services and is provided to the contractor to guide Dredging
operations.
Environment
Council will undertake surveillance and inspections throughout the dredging
services period. Council will be provided with an incident report upon any
incident occurring whilst in the river.
Page 39 of 69
See the original
The page text is free to read. Viewing or downloading an original file needs an account.