Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2022-06-13 General Committee Meeting Agenda PUBLIC

of 65

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   13 JUNE 2022




                                   Page 43 of 69

GENERAL COMMITTEE MEETING AGENDA                                                             13 JUNE 2022

            Attachment 1 Noosa Spit Dredging & Beach Nourishment Tender Consideration Plan

             Background:
             Council has committed to the completion of the Noosa Spit Dredging & Beach Nourishment works
             (Dog Beach).
             The Infrastructure Department has obtained the required environmental permit to complete the
             dredging and nourishment works. The dredging works however must be completed by September
             30" to comply with the permit’s conditions. This leaves only a very small window to engage a
             specialist contractor and complete all the required dredging works.
             The effectiveness of the beach renourishment and river channel dredging will be dependent on the
             completeness of the designed dredging works.
             Operative Provisions:
             1.    DEFINITIONS AND INTERPRETATION
             1.1   Definitions
                    In this Tender Consideration Plan, unless inconsistent with the context or subject matter:
                   (a)    Act means the Loca/ Government Act 2009;
                   (b)    Council means Noosa Shire Council;
                   (c)    Objectives means the objective set out in Clause 2 of this Tender Consideration
                          Plan;
                   (d)    Regulation means the Loca/ Government Regulation 2012;
                   (e)    Tender Consideration Plan means this tender consideration plan, which Council
                          has prepared and adopted pursuant to section 230 of the Regulation.

            2.     OBJECTIVES OF THE TENDER CONSIDERATION PLAN
             2.1   The objective of this Tender Consideration Plan (TCP) is to enter into a contract with a
                   selected contractor for the completion of works for the Noosa Spit Dredging and Beach
                    Nourishment, within the parameters and timeframes of the environment permit issued by
                    Department of Environment and Science.
             2.2    It is proposed that the establishment of this contract be via a competitive Invitation to
                   Quote (ITQ) process to contractors identified as a result of market analysis, as outlined in
                   Section 7 of this TCP.

             2.3    In accordance with the permit that has been granted to Council, there is a specified
                   window of opportunity for the works to be completed. It is anticipated that establishing a

                                                                                             Page 3 of 6

                                                                                             Page 43 of 69
Log in to download the original file

2022-06-13 General Committee Meeting Agenda PUBLIC(PDF, 5MB).pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.