Skip to the record
Every meeting, every word.

Original source · versioned page text

2018-05-14 GC Agenda Attachment 1 to Item 6 Lake MacDonald Dr Community Reference Group Investigations Report

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

7.4      Sensitivity of water supply pipe crossing
Extending from an easement at the end of Liane Drive are four water supply pipes which span the
main channel and project from the creek embankments approximately 1.5m above the creek bed.
The elevations and diameters of each pipe differ slightly with the largest pipe also including metal
frame presumably to prevent people walking across the pipe. Refer to Image 5-2 and Image 5-3.




Image 5-2 Water Supply Pipes across the main channel




Image 5-3 Metal barrier frame attached to pipe crossing




Lake McDonald Flooding Community Reference Group Report                                      Page 33
Log in to download the original file

2018-05-14 GC Agenda Attachment 1 to Item 6 Lake MacDonald Dr Community Reference Group Investigations Report(PDF, 4MB).pdf · 4.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.