Original source · versioned page text
2018-05-14 GC Agenda Attachment 1 to Item 6 Lake MacDonald Dr Community Reference Group Investigations Report
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
7.4 Sensitivity of water supply pipe crossing Extending from an easement at the end of Liane Drive are four water supply pipes which span the main channel and project from the creek embankments approximately 1.5m above the creek bed. The elevations and diameters of each pipe differ slightly with the largest pipe also including metal frame presumably to prevent people walking across the pipe. Refer to Image 5-2 and Image 5-3. Image 5-2 Water Supply Pipes across the main channel Image 5-3 Metal barrier frame attached to pipe crossing Lake McDonald Flooding Community Reference Group Report Page 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.