Original source · versioned page text
2018-05-14 GC Agenda Attachment 1 to Item 6 Lake MacDonald Dr Community Reference Group Investigations Report
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
CRG stakeholders raised concerns about the impact these pipes may be having on flood levels. To
investigate these concerns the upgraded flood model was run for a moderate and major flood
event with and without the pipes included in the model. For the simulation which included the
pipes, the model configuration assumed a complete blockage of flows in the main channel beneath
the pipes and across the pipe profiles.
The flood model results for both the moderate and major flood events showed no change to peak
flood levels at Highland Drive due to the presence of the water supply pipe. Refer to Figure 19
and Figure 20 for flood model results graphed as water level verses time.
No increase in
peak flood levels
Small increase in
flood levels as
water rises over
the pipes.
Figure 19: Flood model results for moderate flood event
Lake McDonald Flooding Community Reference Group Report Page 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.