Appendix E - Traffic Impact Assessment Report
The original of this document is very large (22.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
The results for the analysis of the background traffic and with development traffic for the Rene
Street / Southern Access intersection in the opening year (2022) have been summaries in Table
4-7. Detailed SIDRA outputs have been included in Appendix D.
Table 4-7 SIDRA Outputs – Opening Year (2022)
AM Peak PM Peak
95% 95%
Scenario Approach Avg Back Avg Back
DoS Delay LoS of DoS Delay LoS of
(s) Queue (s) Queue
(m) (m)
Rene Street (South) 0.13 0.1 N/A 0.0 0.17 0.1 N/A 0.0
2022 Background Rene Street (North) 0.09 1.2 N/A 0.9 0.12 0.3 N/A 0.2
Traffic Volumes Southern Site Access 0.01 6.6 A 0.2 0.17 6.9 A 0.9
Intersection Summary 0.13 0.8 N/A 0.9 0.17 0.7 N/A 0.9
Rene Street (South) 0.15 0.8 N/A 0.0 0.15 0.7 N/A 0.0
2022 Background
Traffic Volumes + Rene Street (North) 0.14 3.5 N/A 4.7 0.12 3.3 N/A 4.0
Development Southern Site Access 0.07 9.3 A 1.7 0.05 8.9 A 1.4
Traffic Volumes
Intersection Summary 0.15 2.8 N/A 4.7 0.15 2.6 N/A 4.0
The results presented in Table 4-7 indicate that the access will theoretically operate well within
the practical capacity for a priority controlled intersection (DoS < 0.8). The delays are well within
acceptable limits with the worst performing leg recording an average delay of 9.3s and all legs
scoring LoS A. Queues are also within acceptable limits with the worst performing leg, Rene
Street (North), resulting in a theoretical 95% back of queue of 4.7m, well within the storage
capacity of the right-turn lane. Therefore, it can be concluded that the development will not
adversely impact the performance of the Rene Street / Southern Access intersection in 2022.
The results for the analysis of the background traffic and with development traffic scenarios for
the Rene Street / Southern Access intersection in the future design horizon year (2032) have
been summaries in Table 4-8. Detailed SIDRA outputs have been included in Appendix D.
Ref: B18254TR001_revB - 25 - Medical Centre – Hofmann Drive, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.