43. To facilitate production of As Constructed drawings it is suggested that all design drawings
are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on
the use of ADAC are available at www.adac.com.au).
44. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
45. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
46. As Constructed drawings and data shall be certified by a qualified experienced Civil
Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the
location, level and type of all services and structures. All of which shall be submitted to
Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to
drainage structures, finished ground levels and pavement surface levels. The data shall be
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been
supplied and accepted by Council.
Contributions Towards Council Infrastructure
47. The applicant must pay contributions towards trunk infrastructure in accordance with the
following Planning Scheme Policies and Council Policies:
(a) Planning Scheme Policy 12 – Public Open Space Contributions;
(b) Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
(c) Planning Scheme Policy 16 – Sewerage Headworks Contributions;
(d) Planning Scheme Policy 17 – Water Supply Headworks Contributions;
(e) Planning Scheme Policy 20 – Pathway Trunk Network Contributions;
(f) Council Policy – Rural Roadworks Contributions;
(g) Council Policy – Master Drainage Contributions.
For material change of use of premises approvals the contributions must be paid prior to the
commencement of use, for reconfiguring a lot approval contributions must be paid prior to
Council approval of the plan of subdivision.
The actual amount of the contribution must be calculated and paid in accordance with the
Planning Scheme Policies and variations due to indexation current at the time of payment.
Waste Management
48. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and
Industrial Premises”, including an external imperviously paved area correctly sized for all
refuse and recycling containers and suitably screened from public places and neighbouring
properties.
Noise Nuisance
49. Noise emission from mechanical equipment shall comply with the following requirements:
49.1. Air-conditioning and Refrigeration
7am to 10pm: Maximum background + 5dB(A)
10pm to 7am: Maximum background + 3dB(A)
Page 7 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 77 KB (small file)
- File type
No other editions are linked here.