2. Request to Change Approval
Attached to the e-mail Change to DA (Materials) - MCU16/0079.03.
43. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
44. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
45. A lift must be provided for patrons to access the RSL from the basement car park.
5. REFERRAL AGENCIES
Not Applicable
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Equitable Access and Facilities
1. The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in addition
to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
2. Prior to the commencement of the use, please contact Council's DA Planning Section to
arrange a Development Compliance Inspection.
Infrastructure Charges
3. This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in
accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning
Act 2009 and in conjunction with the State Planning Regulatory Provision (Adopted
Charges).
Noise Building Works
4. Noise from building works associated with commercial and or industrial development should
comply with the following –
a. Limited to between 6:30am to 6:30pm Monday to Saturday.
b. All reasonable measures are taken to minimise noise emissions.
c. Not permitted on Sunday or public holidays.
Food Business Approval – Food Act 2006
5. For the new kitchen proposed in the development, the following is required:
Page 8 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2. Request to Change Approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.