Council archive · source document
Planning Assessment Report · MCU19/0008
Attached to the e-mail Detached House in Coastal Protection Area - MCU19/0008.
22 Arakoon Crescent, Sunshine Beach PLANNING ASSESSMENT REPORT Reclamation PO22 AO22 Development does not involve reclamation of land No acceptable outcome is prescribed. The proposal will not include the reclamation of land below tidal water, other than for the purposes of: below tidal water. 1. coastal‐dependent development, public marine development or community infrastructure; or 2. strategic ports, priority ports, boat harbours or strategic airports and aviation facilities, in accordance with a statutory land use plan or master plan, where there is a demonstrated net benefit for the state or region and no feasible alternative exists; or 3. coastal protection work or work necessary to protect coastal resources or coastal processes. Operational work which is not assessed by local government PO23 AO23 Works are located and designed such that they Tidal work is designed and located in accordance with The proposal will not include tidal works. continue to operate safely during and following a the Guideline: Building and engineering standards for defined storm tide event. tidal works, Department of Environment and Heritage Protection, 2017. TP19/5080 © Bartley Burns Certifiers & Planners P a g e | 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.