GENERAL COMMITTEE MEETING AGENDA 18 JANUARY 2021
the basis of the annual budget process. The maintenance and renewal plans will be reviewed
annually and a more detailed analysis and review completed after the next round of asset condition
assessments.
Risks & Opportunities
It is important to have a good understanding of the risks associated with the operation of the
pathways and boardwalks assets. Council continues to develop its pathways and boardwalks
management activities to ensure that the pathways and boardwalks are meeting the intended
design life, and where necessary work on the optimised intervention for undertaking rehabilitation
and renewal activities.
The key risks associated with achieving the above objectives of Council’s pathways and
boardwalks management activities and associated levels of service have been identified
throughout this Plan and are outlined below:
1. Unanticipated asset deterioration and structural failure possibly accelerated by the increasing
severity in weather and climate change conditions;
2. Asset Performance – No asset failures that influence the service levels. A complete
understanding of all pathways and boardwalks assets and their relevant asset condition will
assist in mitigating potential risks.
3. Asset Knowledge - The need to understand the performance of all the band facilities assets
at component level is essential in mitigating risks. Assets such as retaining walls, carparks,
lighting and signage are assets that require more detailed inspections and improved
maintenance activities to ensure assets do not become a risk to the community.
4. Funding – the ongoing operational and maintenance costs for pathways and boardwalks will
continue to rise and efficiencies and cost savings are reviewed regularly. Grant opportunities
for renewals/upgrades must always be considered.
These risks and all other current risks will be regularly reviewed and if necessary, they can be
documented in the Infrastructure Services – Risk Register.
Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Detailed consultation with Council staff was fundamental in the development of the Plan. The
document review, condition assessments and the development of the renewal and maintenance
plans were a significant part of the consultation undertaken. In addition, the financial data that
related to operating and maintenance expenses and budgets was reviewed by Financial Services.
Departments/Sections Consulted:
x Chief Executive Officer x Community Services X Corporate Services
Executive Officer Director Director
Executive Support Community Development X Financial Services
x Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services Environment & Sustainable Development X Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services X Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development X Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 90 of 155
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.