Council archive · source document
07/2062 - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132007.2062
INTEGRATED PLANNING ACT 1997
Works. that take. overland-flow-water—
The relevant wild river dectaration will state
works that take overland flow water are either
self assessable or assessable, of are exempt
from wild river requirements.
If you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q13 if) an ‘application i is not tequired
to be made however the works must comply With:
the relevant sel-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an appli
‘ls tequired and must be assessed:by NRW "°
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q13 ifi) your application is not
subject to wild river requirements,
Applications for developmerit that is‘dttier-than
that stated to.be assessable, self-adsessable or:
éxempt will not be accepted.
“Works that interfere with overland
flow water
The ‘relevant wild fiver declaration will state
“works that interfere with overland flow.water that’
are either sélf assessable, assessable or exempt
rom wild river requiréments.
Ifyou ticked Q15i), your application must be.
assessed by: NRW against the Wild Rivers Code
and must comply with the code. .
If you ticked Q15 ii) an application i is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
‘Rivers Code, otherwise the works become
assessable development for which an application
ts required and must be assessed by. NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
Myou ticked Q15 iii) your application is not
Subject to wild river requirements,
Applications for development that is other than
. that stated to be assessable, self-assessable or
-exempt will not be accepted. -
Waterway barrier works
Applications for building or raising waterway .
barter works in a HPA will not be accepted,
If you answered YES.to Q16, your application .
‘must be assessed by DPIF against the Wild
-Rivers Code and must comply with the'code.
=
13.
14,
5.
16.
IDAS Assessment Checklist, Version 20, 2 April 2007
}-+2—Boes-the application involve works that take overland flow water in a HPA or an FMA?
10 oO YES (ensure you have completed Part Ks of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
LJ i) assessable works ;
(J ii) self-assessable works .
(iii) exempt works
Does the application involve works that interfere with overland flow water i ina FMA?
mH NO O YES {ensure you have completed Part Kro of Form. 1)
If YES, is the application for works stated in the relevant wild tivers dectaration tobe?
(1) assessable works
(LJ ii) self-assessable works
Diy exempt works
Does the application involve building or raising waterway barrier works in a PA?
Ae O YES (ensure you have completed Part Os of Form 1)
Aquaculture (non ERA}
Applications for aquaculture in a HPA will not'’be
accepted.
if you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Does the application involve aquaculture in a PA?
“TNO (yes (ensure you have completed Part O; of Form 1)
Works that interfere with water in a
watercourse
Note: tf the developments proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or.weirs,
stream reafignment or stream diversion) will not
be accepted.
tn a PA, applications for instream dams and .
weirs may be accepted in nominated waterways.
If you ticked box ii) in Q19, your application will
not be accepted.
-Note: Operational works outside a HPA or
nomlnated waterway are not subject to wild
tiver requirements,
More information and locations of noritinated
waterways is available by contact NRW,
‘accessing the department's website
www.nrw.ald.qov.au oF contacting the
-department by email on:
wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA? .
NO oO YES (ensure you have completed the relevant Part K of Form 1)
If YES, .
O i) The application is for an instream dam or weir; or
oO il) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir. .
Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2062 - MCU - Multiple Housing Type 2 - Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.