Skip to the record
The gold standard in government transparency.

Council archive · source document

07/2062 - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132007.2062

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

_ INTEGRATED PLANNING ACT 1997
_ Environmentally relevant activities

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
require Teferral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DRIF, NRW or delegated

- local govemment (see/EPA website for more
information on devolved ERAs) .

ifyou answered NO to Q20 you do not heed to
complete Qs 21-24.

Ifyou answered YES to. 20 and the. a 4

  
 
 
   
 
 

development is isin aPA, yo jon must be’

“ development where ‘an. spear nie
accepted, or is. ‘exempt from wild river ”
requirements (see'Q2): You willbe able to”. . -
determine if an“appli
‘for the'development
W you answered NO'to 021, you: donot need. to
complete Q22. fyou ‘answered YES to a2 you
-are required: to comptéte 022. .

cHyou answered N

 

_with the; ‘code.

“Ifyou answered Ni
‘is proposed in the

 
 

NRW (a8 prescribed in’schedule 8A of.the PA)”
* against the Wild Rivers Code and must comply’. J
‘with the code. =.”
if you answered YES to'Q24 the application wail
not be accepted. if you answered NO to Q24,
your application must be assessed by NRW .
against the Wild Rivers.Code and must comply
‘with the code,
Exempt ERAs in a: designated urban
varea

* Ifthe development is proposed in a designated .

‘urban aréa there may be no wild river
“requirements. See Section 2 Q2.

Note: All applications that can be  decepted must
be assessed against and must comply.with the
Wild Rivers Code (ather-than exempt ERAs in a :
designated urban area).

 

20.

21.

22.

23.

 
   
 
 
 
   

‘Lino

: IDAS Assessment Checklist, Version 20, 2 April 2007
Doés the application involve an ERA?. .

Fr NO oO YES {ensure you have completed Part G of Form1)

Is the application for an ERA 20 instream? .

[+]NO Dyes
Is a quarry allocation notice held for the proposed ERA 20 instream?
IZ] No Clyes

Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)

iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

i) an ERA 22 {out of stream)

[No Clyes
Is the proposed development for ERA 20 (out of stream) and;
— inaFMA; and

— not low impact; and
—- not for a residential complex in the area, or for specified works.

Llyes

 

‘Documentation

if you answered NO to-Q25, your application .
may be subject to an information request and
processing of the application may-be delayed. -

 

25.

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requiremen
as set out in the relevant part/s of the Wild Rivers Code?

 

‘  “L]No C] yes
21 The administering authority may be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW. .

Page 14.

 

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2062 - MCU - Multiple Housing Type 2 - Duplex [As Published].pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.