ORDINARY MEETING MINUTES 26 JUNE 2014
ENGINEERING
External Works
17. David Low Way must be upgraded for the length of its frontage to the subject
site. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
(a) construction of a pedestrian footpath in accordance with the conditions of
this Decision Notice
(b) reinstatement of the footpath and verge area to match the balance of the
site frontage, including the provision of topsoil and turf where the existing
verge is disturbed.
Site Access and Driveways
18. A sealed access driveway must be provided from David Low Way to all parking
and maneuvering areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
(a) a driveway crossover in accordance with IPWEAQ standard drawing SEQ
R-051
(b) suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance pedestrian safety
19. The internal driveway must be designed and constructed with widths, crossfalls
and gradients in accordance with Australian Standard AS/NZS 2890.1:2004 –
Parking Facilities.
Car Parking
20. A minimum of 12 car parking spaces must be provided and marked on the site.
The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
(a) 3 visitor parking spaces within the total, which are clearly marked for that
purpose and accessible at all times for visitor use
(b) crossfalls and gradients in accordance with Australian Standard AS/NZS
2890.1:2004 – Parking Facilities
(c) garages, including door openings, in accordance with section 5.4 of
Australian Standard AS/NZS 2890.1:2004 – Parking Facilities
Pedestrian
21. Pedestrian facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular a 2 metre wide concrete footpath within the road verge for
the entire length of the site’s frontage to David Low Way.
Stormwater Drainage
22. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be:
(a) generally in accordance with drawing number 17011-SW1 B prepared by
SCG Consulting Engineers
(b) undertaken in accordance with an Operational Works approval.
This is not an official copy of Council’s Minutes
Page 11 of 33