ORDINARY MEETING MINUTES 26 JUNE 2014
Electricity and Telecommunication Services
23. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
24. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Earthworks and Retaining Walls
25. All fill and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council.
Damage to Services and Assets
26. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority for
approval.
ENVIRONMENT
Waste Storage
27. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy 9, Waste Management, including an external
imperviously paved area correctly sized for all refuse and recycling containers
and suitably screened from public places and neighboring properties.
28. A bin wash area is required with a cold-water tap, hose and drain outlet
connected to sewer, via a bucket trap. The drain outlet must be designed to
prevent storm water entry to the sewerage system which can be achieved by a
bunded area, with a nib wall height of 100mm maximum, enclosing a wash area
of 700mm x 700mm minimum (max 0.7m²). Alternatively the waste area can be
roofed, or any other appropriate design approved by council that would prevent
storm water entry to the sewer.
Noise
29. Written certification is required from a suitably qualified person confirming that
sound pressure levels from all mechanical plant and equipment comply with the
following :
(a) Air-conditioning and Refrigeration
7am to 10pm: Maximum level allowable = background + 5dB(A)
10pm to 7am: Maximum level allowable = background + 3dB(A)
This is not an official copy of Council’s Minutes
Page 12 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.