2014-06-26 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 26 JUNE 2014
Stormwater Quality Management
36. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
the latest version of the Water Sensitive Urban Design Technical Design Guidelines
for South East Queensland, and must include in particular:
(a) stormwater quality treatment devices of a size and location generally in
accordance with those shown in section 5 of the of the Site Based Stormwater
Management Plan listed in this Decision Notice.
(b) bioretention devices which:
(i) are designed generally in accordance with IPWEQA Standard Drawing
No. WSUD-001.
(ii) incorporate a coarse sediment forebay (in addition to the required filter
media surface area), which is sized in accordance with the latest version
of the Water Sensitive Urban Design Technical Design Guidelines for
South East Queensland and designed generally in accordance with
IPWEQA Standard Drawing No. WSUD-005.
(iii) have safe, unobstructed and all weather access from the road frontage
for maintenance purposes, particularly for the coarse sediment forebay.
(iv) are provided with a high flow bypass to ensure that flows which exceed
the treatment capacity of the device are bypassed in order to avoid
damaging of the filter media or subjecting the filter media to excessive
sediment loads.
(v) are provided with a free-draining outlet from the sub-soil drainage system.
(vi) treat stormwater from all developed catchments (including roof and
carpark catchments) prior to discharge.
37. Permanent educational signage must be erected to educate the customers to the
development about the function of the bioretention device(s). The dimensions,
standard, presentation and location of the educational signage must be in
accordance with an Operational Works approval. *(Refer to Advisory Note)
Vegetated Devices
38. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The
approved Operational Works drawings for the stormwater quality treatment system
and detailed life cycle costing of the system must be attached as an addendum to this
document. Records of all maintenance activities undertaken must be kept and made
available to Council upon request.
Rainwater Harvesting
39. Operating rainwater collection tanks must be provided for the development. The
tanks must be provided in accordance with an Operational Works approval and must
include in particular:
(a) the details identified in section 5 of the Site Based Stormwater Quality
Management Plan listed in this Decision Notice
(b) a total tank capacity of 50 000 litres
(c) Deleted.
(d) re-use of harvested rainwater for internal non-potable uses and outdoor uses.
This is not an official copy of Council’s Minutes
Page 23 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.