ORDINARY MEETING MINUTES                                                           26 JUNE 2014


    40.   Certification must be submitted to Council from a qualified person* which certifies that
          the rainwater collection tank and associated reticulation have been installed in
          accordance with the requirements of this Decision Notice. *(Refer to Advisory Note)
    Easements
    41.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property. All easements must be designed in
          accordance with the planning scheme and granted at no cost to the Grantee. Where
          the Grantee is Council or a service authority, the easement documentation must be in
          accordance with the Grantee’s standard easement terms.
    42.   Draft easement documentation must be submitted to Council for endorsement.
    43.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.
    Earthworks and Retaining Walls
    44.   All fill and associated batters must be must be undertaken in accordance with an
          Operational Works approval, and contained entirely within the subject site unless
          written permission from the respective landowner(s) is provided to Council.
    Damage to Services and Assets
    45.   Any damage caused to existing services and assets above or below the ground must
          be repaired:
          (a)   where the damage would cause a hazard to pedestrian or vehicle safety,
                immediately; or
          (b)   where otherwise, upon completion of the works associated with the
                development.
          (c)   Any repair work which proposes to alter the alignment or level of existing
                services and assets must first be referred to the relevant service authority for
                approval.
    UNITYWATER
    Water and Sewerage
    46.   The fire-fighting demand on Unitywater’s water supply system from the development
          must not exceed 30 litres per second.
    47.   A single Unitywater installed primary water meter must be provided immediately
          inside the property boundary. Additional water meters must be installed for each title
          of a community title or sub-lease scheme. Meters must be Unitywater approved,
          installed in accordance with Unitywater standards and requirements and remain
          accessible at all times for reading and maintenance purposes.
    48.   Water meters must be located on alternative boundaries to electrical pillars.
    49.   Buildings and other structures must maintain a minimum clearance of 1.5 metres
          from Unitywater sewer mains, and 1.0 metre from sewer manhole chambers and
          inspection openings.
    50.   The applicant must adjust the level of the existing sewerage inspection opening as
          necessary to suit the proposed finished levels. Work must be undertaken by
          Unitywater at the owner’s cost. Where the existing sewerage inspection opening point
          is located within a sealed or concreted area, a brass cap is required to be fitted.
    51.   Storm water retention systems and gross pollutant traps must maintain a minimum
          clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.

                        This is not an official copy of Council’s Minutes
                                                                                   Page 24 of 33
Log in to download the original file

2014-06-26 Ordinary Meeting Minutes(PDF, 402KB).pdf · 412 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.