ORDINARY MEETING MINUTES 26 JUNE 2014
ENGINEERING
Footpath Connectivity
6. It is advised to enter into discussions with the owner of the Noosa Civic (Lot 3
SP246584), so as to complete a small portion of footpath adjacent to the office
buildings within the western portion of their site adjoining the small roundabout along
Hoffman Drive. This small section of unfinished pathway within private property, will
provide connectivity to both the Noosa Civic Shopping Centre and the proposed
development.
Building and Construction Industry (Portable Long Service Leave) Levy
7. From 1 January 2000, the Building and Construction Industry (Portable Long Service
Leave) Levy must be paid prior to the issue of a development permit where one is
required for the 'Building and Construction Industry'. This applies to Building Works,
Operational Works and Plumbing and Drainage Works applications, as defined under
the Sustainable Planning Act 2009, where the works are $80,000 or more and
matching the definition of 'Building and Construction Industry' under the Building and
Construction Industry (Portable Long Service Leave) Act 1991. Council will not be
able to issue a Decision Notice without receipt of details that the Levy has been paid.
Should you require clarification in regard to the amendments to the Building and
Construction Industry (Portable Long Service Leave) Act 1991, you should contact
QLeave on 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
8. To assist Council to undertake an integrated assessment of the operational works
application, all aspects of the works must be included in one (1) application and be in
accordance with Council’s planning scheme. Additional application fees apply to
applications where the different aspects of the works are lodged separately.
Significant savings in application fees will result if all works are lodged in a single
application.
Preparation of a Preliminary Construction Management Plan
9. The works identified in this Decision Notice will be required to be carried out in
accordance with a Construction Management Plan endorsed by Council through an
approval for Operational Works. To ensure expedient assessment of any
Operational Works application, the applicant is advised to submit a preliminary
Construction Management Plan that addresses the requirements of the planning
scheme. In particular, the preliminary Construction Management Plan should
address the following:
(a) traffic management during all aspects of the construction phase including:
(i) a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
and traffic control measures prior to construction
(ii) maintenance of safe pedestrian access across the frontage of the site
both during daily construction and after daily construction has ceased
(iii) proposed fencing to the site during the construction phase of the
development
(iv) approval of the Traffic Management Control Plan by the Department of
Main Roads (DMR) for any works on State controlled roads
(b) maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures
This is not an official copy of Council’s Minutes
Page 26 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.