ORDINARY MEETING MINUTES 26 JUNE 2014
(c) works programme identifying key components of the works and their respective
durations
(d) establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues
(e) identification of complaint management procedures including:
(i) contact details for the on-site manager
(ii) dispute resolution procedures
(f) details on the location of external fill sites/sources, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage. NB any
damage to the existing road system as a result of haulage operations shall be
fully repaired at the applicant’s expense
(g) it is acknowledged that the Construction Management Plan will be a draft
document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.
HYDRAULICS AND WATER QUALITY
Qualified Person
10. For the purpose of certifying that the design of the rainwater harvesting system is in
accordance with the requirements of this decision notice, a qualified person is
considered to be a Registered Professional Engineer of Queensland (RPEQ), builder
or plumber.
Lawful Point of Discharge
11. The applicant is advised that a lawful point of discharge for the development will need
to be determined and demonstrated as part of a detailed design solution included
with the Operational Works application.
Bioretention Basin Educational Signage
12. Suggested wording for the permanent educational signage required by this Decision
Notice is as follows:
“BIORETENTION BASIN - This bioretention basin reduces the pollution of our
waterways by reducing the amount of heavy metals, litter, suspended solids, and
nutrients discharged to (insert name of receiving waters)”.
Waste Management Operational Phase
13. For the purpose of demonstrating compliance with the waste management condition,
the applicant is requested to contact Council’s Waste Management Branch. The
respective waste collection vehicles (i.e. for collection of 240l wheelie bins, 1100l and
greater bulk bins) and their dimensions will be provided upon standard drawings
when requested.
Note: Council’s Waste Contract does not include the supply of waste compactor
equipment. Only the service of a compactor is provided under the contract by
Council. Subsequently the applicant must ensure that any compactor intended for
use by the development can be serviced utilising the Contractor provided Waste
Compactor Servicing Vehicle.
This is not an official copy of Council’s Minutes
Page 27 of 33