Working Drawings- September 21
Attached to the e-mail Email with further plans.msg.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
LEGEND - INTERNAL
AP - APPLIANCE CUPBOARD
BC - BROOM CUPBOARD
8m BUILDING HEIGHT LINE 42 x 19 PRE PRIME PINE TRIMS C'BD - CUPBOARD
FROM NATURAL GROUND TO ALL OPENINGS IN CLAD DP - DOWNPIPE
SELECT METAL ROOF SHEET DW - DISHWASHER PROV.
COLORBOND PARAPET CAPPING WALLS FW - FLOOR WASTE
(TRIMDECK PROFILE) @ 5.0° ON GAS - GAS CONNECTION
SCYON AXON 133 SMOOTH ENGINEER DESIGNED TRUSSES HP - HOT PLATE
SA HWS - HOT WATER SYSTEM
CLADDING. PAINT FINISH. JAMES L - LINEN
591 O'HANG RL. 11.972 m MH - MANHOLE
HARDIE 9mm ALUMINIUM
1400
EXTERNAL CORNER (#305521) SA133 SELECT METAL FASCIA AND
MW - MICROWAVE PROV.
OHC - OVERHEAD CUPBOARD
AND JAMES HARDIE 9mm RL. 12.039 m GUTTER PTY - PANTRY
R - ROBE
ALUMINIUM INTERNAL CORNER
300
SCYON AXON 133 SMOOTH RL 11.810
REF - REFRIDGERATOR SPACE
(#305520) RH - RANGEHOOD
SA133 CLADDING. PAINT FINISH. JAMES SH - SHELF
HARDIE 9mm ALUMINIUM TR - TOWEL RAIL
SA133
2700 CEILING
EXTERNAL CORNER (#305521) TRH - TOILET ROLL HOLDER
2100 JOINERY
SA133
UBO - UNDER-BENCH OVEN
RBB AND JAMES HARDIE 9mm WO - WALL OVEN
FC ALUMINIUM INTERNAL CORNER LEGEND - EXTERNAL
(#305520) BV - BRICK VENEER
BLUEBOARD CLADDING. SELECT CJ - CONTROL JOINT
RENDER FINISH FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS
RL 9.070 RBB - RENDERED BLUEBOARD
RL 8.750 RB - RENDERED BRICKWORK
150x50 HARDWOOD POSTS RBL - RENDERED BLOCKWORK
SA - SCYON AXON
2400 CEILING
ON GALV. BRACKET
2040 JOINERY
SL - SCYON LINEA
RBL GHWU SM - SCYON MATRIX PANELING
HARDIFLEX 6mm FC SHEET WITH SA133 SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT
EXPRESS JOINT STRIPS RL. 6.690 m
150x75 HARDWOOD FRAMEWORK
RL 6.310
POLYCARB. SHEET ROOF OVER
450d HEKA HOOD WINDOW SURROUND
UNIT 2 - FRONT ELEVATION
90 x 90 x 2.0 SHS DURAGAL POST
1 : 100
RL. 3.659 m ISSUE
RL. 3.293 m # DATE DETAILS BY
- 21-09-19 INCOMPLETE DC
8m BUILDING HEIGHT LINE 600 O'HANG - 26-09-18 PRELIM ISSUE DC
FROM NATURAL GROUND COLORBOND PARAPET CAPPING - 23-10-18 WD ISSUE DC
E 18-06-19 SITE REV DC
SELECT METAL FASCIA AND F 09-06-21 PRE-CONTRACT
GUTTER
1400 PARAPET
- - - -
SELECT METAL ROOF SHEET - - - -
(TRIMDECK PROFILE) @ 5.0° ON - - - -
ENGINEER DESIGNED TRUSSES
ROOF UPSTAND
250
RL 11.810
2700 CEILING
po box 6384 p (07) 5442 6413
WB SA133 maroochydore f (07) 5450 6437
SA133
2100 JOINERY
BLUEBOARD CLADDING. SELECT qld 4558 QBCC 1083000
RENDER FINISH FG FG
This plan remains copyright to
Ausmar Group and may not be
used in part or in whole without
GLASS BALUSTRADE TO COMPLY the written consent of the author.
FG © 2017 Ausmar Group
WITH BCA 3.9.2 RL 9.070
RL 8.750 WRITTEN DIMENSIONS TO
SCYON AXON 133 SMOOTH TAKE PRECEDENCE OVER SCALE
CLADDING. PAINT FINISH. JAMES
2440 CEILING
UNIT 2
2100 JOINERY
SCYON AXON 133 SMOOTH HARDIE 9mm ALUMINIUM
CLADDING. PAINT FINISH. JAMES SA133 A/C UNIT EXTERNAL CORNER (#305521)
HARDIE 9mm ALUMINIUM SA133 AND JAMES HARDIE 9mm ELEVATIONS
EXTERNAL CORNER (#305521) ALUMINIUM INTERNAL CORNER
PROJECT DESCRIPTION:
AND JAMES HARDIE 9mm (#305520)
ALUMINIUM INTERNAL CORNER RL 6.310 Proposed Duplex For:
(#305520)
CLIENT:
MR K ANSCHAU
90 x 90 x 2.0 SHS DURAGAL POST SITE ADDRESS:
UNIT 2 - REAR ELEVATION LOT 1 WERIN ST
TEWANTIN
1 : 100 DESIGNED BY REDDOOR
CUSTOM
DRAWN BY D CARTER
SCALE JOB CODE
1 : 100
ALL FIXING AND FLASHING TO BE IN STRICT ACCORDANCE WITH THE DATE
09-06-21
D-KA
MANUFACTURERS DETAILS. WINDOW SIZES SHOWN ARE NOMINAL ONLY AND
ARE TO BE VERIFIED BY THE BUILDER ON SITE. SHEET 10 OF 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.