Original source · versioned page text
Working Drawings- September 21
Attached to the e-mail Email with further plans.msg.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
LEGEND - INTERNAL
AP - APPLIANCE CUPBOARD
SELECT METAL ROOF SHEET SELECT METAL FASCIA AND JAMES HARDIE PRIMELINE BC - BROOM CUPBOARD
C'BD - CUPBOARD
(TRIMDECK PROFILE) @ 5.0° ON GUTTER "NEWPORT" CLADDING. PAINTED
FLAT COLORBOND SHEET OVER DP - DOWNPIPE
SCYON SECURA BASE SHEET ENGINEER DESIGNED TRUSSES FINISH. JAMES HARDIE DW - DISHWASHER PROV.
FW - FLOOR WASTE
ALUMINIUM SNAP ON CORNER GAS - GAS CONNECTION
(#305513) HP - HOT PLATE
BLUEBOARD CLADDING. SELECT SA133 HWS - HOT WATER SYSTEM
RENDER FINISH L - LINEN
RL 12.860 MH - MANHOLE
WB MW - MICROWAVE PROV.
OHC - OVERHEAD CUPBOARD
PTY - PANTRY
R - ROBE
3000 CEILING
FG FG FG
REF - REFRIDGERATOR SPACE
2400 JOINERY
WB RH - RANGEHOOD
SELECT FEATURE TILE FINISH SH - SHELF
OVER 190 SERIES BLOCKWORK TR - TOWEL RAIL
TRH - TOILET ROLL HOLDER
UBO - UNDER-BENCH OVEN
WO - WALL OVEN
LEGEND - EXTERNAL
RL 9.820 BV - BRICK VENEER
RBB
RL 9.440 CJ - CONTROL JOINT
WB FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS
2400 CEILING
RBB - RENDERED BLUEBOARD
2100 JOINERY
RB - RENDERED BRICKWORK
RBL - RENDERED BLOCKWORK
SA - SCYON AXON
SL - SCYON LINEA
SM - SCYON MATRIX PANELING
SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT
RL 7.000
RBB
42x42 LOSP PRE-PRIME PINE. SCREEN
WITH 100mm SPACINGS ON ALUM. FRAME.
90 x 90 x 2.0 SHS DURAGAL POST
UNIT 1 - RIGHT ELEVATION SLANTED 90x90x4.0 SHS COLUMNS
IN ACCORDANCE WITH ENGINEER DESIGN
1 : 100 ISSUE
SCYON AXON 133 SMOOTH # DATE DETAILS BY
CLADDING. PAINT FINISH. JAMES SELECT METAL ROOF SHEET - 21-09-19 INCOMPLETE DC
HARDIE 9mm ALUMINIUM RL. 13.378 m - 26-09-18 PRELIM ISSUE DC
609 O'HANG (TRIMDECK PROFILE) @ 5.0° ON
EXTERNAL CORNER (#305521) ENGINEER DESIGNED TRUSSES - 23-10-18 WD ISSUE DC
AND JAMES HARDIE 9mm RL. 11.987 m E 18-06-19 SITE REV DC
ALUMINIUM INTERNAL CORNER F 09-06-21 PRE-CONTRACT
(#305520) RL. 11.987 m 600 O'HANG - - - -
SELECT METAL FASCIA AND
- - - -
RL. 12.039 m GUTTER - - - -
RL. 12.486 m
RL 11.810
SA133 WB
2700 CEILING
po box 6384 p (07) 5442 6413
WB
2100 JOINERY
maroochydore f (07) 5450 6437
SA133 SA133 qld 4558 QBCC 1083000
GLASS BALUSTRADE WITH ALUM. This plan remains copyright to
Ausmar Group and may not be
RAIL. PATCH FIX TO BALCONY. used in part or in whole without
FG FG FG TO COMPLY WITH B.C.A. 3.9.2 the written consent of the author.
© 2017 Ausmar Group
RL 9.070
RL 8.750 WRITTEN DIMENSIONS TO
TAKE PRECEDENCE OVER SCALE
42 x 19 PRE PRIME PINE TRIMS
2400 CEILING
2100 JOINERY
TO ALL OPENINGS IN CLAD
RBB WALLS
ELEVATIONS
RBB
90 x 90 x 2.0 SHS DURAGAL POST
PROJECT DESCRIPTION:
FG FG FG
RL 6.310 Proposed Duplex For:
RBB
CLIENT:
BLUEBOARD CLADDING. SELECT MR K ANSCHAU
RENDER FINISH
SITE ADDRESS:
LOT 1 WERIN ST
TEWANTIN
UNIT 2 - RIGHT ELEVATION DESIGNED BY REDDOOR
CUSTOM
DRAWN BY D CARTER
1 : 100 SCALE JOB CODE
1 : 100
ALL FIXING AND FLASHING TO BE IN STRICT ACCORDANCE WITH THE DATE
09-06-21
D-KA
MANUFACTURERS DETAILS. WINDOW SIZES SHOWN ARE NOMINAL ONLY AND
ARE TO BE VERIFIED BY THE BUILDER ON SITE. SHEET 9 OF 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.