Skip to the record
Search everything, all in one place.

Original source · versioned page text

25-11-22 Operational Management and Maintenance Plan_Issue A

of 25

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
PRE-START MEETING

List pre-start meeting attendees who are to sign indicating they have attended the meeting and understand the design intent,

construction and establishment process.

Location

Date

 

ROLE/STAKEHOLDER COMPANY CONTACT NAME

CONTACT DETAILS

 

Developer

 

Site superintendent (civil)

 

Site
superintendent(landscape)

 

Bioretention designer

 

Civil engineer

 

Landscape architect

 

Civil contractor

 

Landscape contractor

 

Other

 

Other

 

Other

 

 

 

 

Comments (attach and refer to additional pages if necessary)

Actions (attach and refer to additional pages if necessary)

 

io woterbyd

 

ON Construction and Establishment Guidelines
Log in to download the original file

25-11-22 Operational Management and Maintenance Plan_Issue A.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.