Original source · versioned page text
25-11-22 Operational Management and Maintenance Plan_Issue A
Plans and drawings: the text below has words only, no drawings.
PRE-START MEETING List pre-start meeting attendees who are to sign indicating they have attended the meeting and understand the design intent, construction and establishment process. Location Date ROLE/STAKEHOLDER COMPANY CONTACT NAME CONTACT DETAILS Developer Site superintendent (civil) Site superintendent(landscape) Bioretention designer Civil engineer Landscape architect Civil contractor Landscape contractor Other Other Other Comments (attach and refer to additional pages if necessary) Actions (attach and refer to additional pages if necessary) io woterbyd ON Construction and Establishment Guidelines
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.