Original source · versioned page text
25-11-22 Operational Management and Maintenance Plan_Issue A
Plans and drawings: the text below has words only, no drawings.
BIORETENTION SYSTEM CONSTRUCTION & ESTABLISHMENT SIGN-OFF FORMS Asset |.D. System location: DANo. ee Civil drawing no. Landscape drawing no. Area: Catchment Area (ha): Bioretention Area (ha): ROLE/STAKEHOLDER COMPANY CONTACT NAME CONTACT DETAILS Developer Site superintendent (civil) Site superintendent (landscape) Bioretention designer Civil engineer Landscape architect Civil contractor Landscape contractor Council compliance officer CHECKLIST OF SIGN-OFF FORMS SIGN-OFF FORM DATE COMPLETED NAME OF SIGNATORY & ROLE SIGNATURE (E.G. SUPERINTENDENT) Pre-Start Meeting Form A — Earthworks & Functional Structures Form B — Under-Drainage Form C — Bioretention Media Form D — Finished Levels Form E — Coarse Sediment Forebay Form F — Protective Measures Form G — Landscape Installation Form H — Landscape Establishment elines € Walel bygesign 109
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.